Dams:
Indravati Dam (Masonry, Gravity Type )
Latitude 190- 16' N
Longitude 420 - 50' E
Catchmment 1153 Sq.K.M.
Length overall 539 M
Length of Non-overflow sections 410
M.Length of Spillway including piers 129 M.
Deepest bed level R.L. 600 M.
Dam Top level 645 M.
Width 7.5 M.Maximum height of Dam 45 M.Spillway Crest Level 629.5 M.Radial Gate No. / Width x Height 7 / 15.00 x 12.5 M.Capacity MWL EL 643 11,430 Cu.M./Sec.Depletion sluices No./ Width x Height 4 / 2.00 x 3 M.Sill Level of depletion sluice 610 M.
Discharge: EL 643 555 Cu.M./Sec.
Podagada Dam (Homogenous Earth fill):
Latitude 190 - 14' N
Longitude 820 - 49' E
Catchment 389 Sq.K.M.
Length Overall 462 M.
Deepest Bed level 570 M
Dam Top Level 647 M.
Top Width 9.0 M.
Parapet height 1.0 M.
Maximum height above bed level 77 M.
Protection:
Upstream 0.6 m. Riprap over 0.3 m. Filter
Down stream Grass Turfing
Depletion Tunnel
Number/ Diameter 1/ 6.2 M.
Sill Level of depletion tunnel 590 M.
Discharge M.R.L 643 650 Cu.M./Sec.
Kapur Dam (Homogenous Earth Fill )
Latitude 190 - 6' N
Longitude 820 - 47' E
Catchment 60 Sq.K.M.
Length overall 537 M
Deepest bed level 582 M
Dam Top Level 646 M.
Top Width 9.0 M.Parapet height 1.0 M.
Maximum height above bed level 64 M.
Protection:
Upstream 0.6 m. Riprap over 0.3 m. Filter
Downstream Grass turfing
Muran Dam (Masonry, Gravity Type)
Latitude 190 -6' N
Longitude 820 - 46' E
Catchment 1028 Sq.K.M.
Length, overall 590.9 M
Length of Non-overflow section 495.9 M.
Length of Spillway including piers 95 M.
Deepest bed level 580 MDam
Crest level 645 M.Width 7.5 M.M
aximum height of Dam above deepest foundation 65 M.Spillway crest level 629.5 M.Radial Gates Nos./ Width/ Height 5/ 15.0/ 12.5 m.Capacity 8,000 Cu.M./ Sec.Depletion sluices No./ Width / Height 4/ 1.5 x 4 MDischarge M.R.L. 643 M 588 Cu.M./ Sec.
Sill level of depletion sluice 595.230 M.
[ : Information available in this manual was last accses on 14/08/2017 ]
While all efforts have been made to make this website as authentic as possible, I & PR deptt. and Luminous Infoways will not be responsible for authentication of proactive disclosure and annual report. Respective department and Public Authority is responsible for their information. Users are advised to verify/check any information with the relevant department(s) and/or other source(s), before acting on the information provided in the Portal.