Pressure Tunnels:
Nos. 02
Length 298 M.
Diameter 5.25 M.
Bottom level of pressure tunnel 586.095 M
Lining Thickness (Steel Liner ASTM 537)0.3 M.(Class-2 with stiffener)
Liner Plate thickness 16 mm.
Penstock Nos.04
Diameter 3.5 m.
Length 790 m.
(Steel shell ASTM 537, Class II shell)
Plate thickness Maximum 45 mm.
Minimum 22 mm.
Tail Race Channel:
Base Level 260 m.
Length 9 KM
Width, Bed Maximum 20 m. Minimum 18 m.
Concrete Lining thickness 0.15 m.
Discharge 210 Cum./Sec
Depth at Maximum flow 5.0 m.
By Pass Tunnel at Right Dyke No. III
Bed level 620 M
Shape Horse ShoeLength 254 M
Maximum Dia 3.5 M
Turbine
Make M/S Fuji Electric Co. Ltd. Japan
Type Vertical, Fancis
Rated Speed 428.6 RPM
Max. Run away speed 730 RPM
Out Put at 360 m. head and 100% gate opening 163.3 MW
Discharge at the above output 47.1 cum/Sec.
Efficiency at the above head and discharge 94.1%
Generator
Make M/S Fuji Electric Co. Ltd. Japan
Type Synchronous
Voltage 11 KV, (+,-) 5%
Frequency 50 HZ, (+,-) 2%
Power Factor 0.90 Lag
Rated Out Put 150 MW
Max. Var Out Put 135 MVAR
Rating 166.7 MVA
The dates of commissioning and commercial operation of the four units of Indravati Power House are as follows:
|
Sl. No. |
Unit |
Date of Commissioning |
Date of Commercial Operation |
|
1 |
2 |
3 |
4 |
|
1 |
Unit - 1 |
05-09-1999 |
19-09-1999 |
|
2 |
Unit - 2 |
23-12-1999 |
28-12-1999 |
|
3 |
Unit - 3 |
30-09-1999 |
04-10-2000 |
|
4 |
Unit - 4 |
16-04-2001 |
19-04-2001 |
The project provides peak power up to 600 MW with design energy of 1962 MU in 90% dependable year. The capital outlay of the project is 1107 Crores.
[ : Information available in this manual was last accses on 14/08/2017 ]
While all efforts have been made to make this website as authentic as possible, I & PR deptt. and Luminous Infoways will not be responsible for authentication of proactive disclosure and annual report. Respective department and Public Authority is responsible for their information. Users are advised to verify/check any information with the relevant department(s) and/or other source(s), before acting on the information provided in the Portal.