MANUAL-1
Particulars of Organization, Functions & Duties
[Section-4 (1) (b) (i)]
1. About the Organization:
Salandi Dam across River Salandi at Hadgarh has been constructed at Latitude of 21-17'-18" and Longitude of 86-18"-00" East. A Barrage has also been constructed across river Salandi at Bidyadharpur 6.50Km. Downstream of the Dam a Hadgarh. Salandi Main Canal off-takes from the Barrage at Bidyadharpur. The Charampa Branch Canal off-takes from RD.6.84 Km. of Main canal at Ambahata & other Distributaries, Minors & Sub-Minors off-takes from Charampa Branch Canal. The Salandi Project with its canal system was commenced during, the year 1960-61 & completed during 1981-82 with a total cost of Rs. 1786.39 Lakhs.
Salandi Canal Division, Bhadrak looks after the maintenance work of Salandi Left Canal System. The left canal system of Salandi Irrigation Project having a total ayacut of 45482 Ha. Spreads through three districts & seven blocks as detailed below.
A. Details of Ayacut:
| Sl. No. |
Name of District |
Name of Block |
Ayacut Created |
||
|
Left Canal System |
Dasamouza System |
Total |
|||
| 1 |
Keonjhar |
Hatadihi |
12 |
- |
12 |
| 2 |
Balasore |
Khaira |
5207 |
- |
5207 |
| 3 |
- |
Simulia |
13626 |
- |
13626 |
| 4 |
- |
- |
- |
- |
- |
| 5 |
Bhadrak |
Bonth |
1067 |
- |
1067 |
| 6 |
- |
Bhadrak |
11961 |
14104 |
13375 |
| 7 |
- |
Tihidi |
456 |
6238 |
6694 |
| 8 |
- |
Basudevpur |
5501 |
- |
5501 |
|
- |
Total |
37830 |
7652 |
45482 Ha |
|
B. Details of Canals:
|
Sl. No. |
|
|
|
1 |
Length of Main Canal |
7.00 km |
|
2 |
Length of Branch Canal |
38.50 km |
|
3 |
Length of Distributaries |
137.50km |
|
4 |
Length of Minors & Sub-minors |
290.00km |
|
Total |
473.00 km |
|
Out of above 473.00 km. of Canals 176.22km. Of Canal banks are used for communication purpose.
C. Details of Embankments: Apart from the above, this Division looks after repair & maintenance of different category of embankments as detailed below:
|
Sl. No. |
Name of Embankment |
Length in km. |
Name of District |
Constituency |
| 1 | 2 | 3 | 4 | 5 |
|
A |
River Embankment |
|||
|
1 |
C.E.No. 2A on Salandi Right |
14.50 |
Bhadrak |
Bhadrak |
|
Sl. No. |
Name of Embankment |
Length in km. |
Name of District |
Constituency |
|
2 |
O.A.E. on Salandi left |
10.50 |
Bhadrak |
Bhadrak |
|
3 |
O.A.E. on Salandi Right |
10.40 |
Bhadrak |
Bhadrak |
|
4 |
Badpur-kabirpur Embkt. on kansabans Rt. |
10.00 |
Balasore |
Simulia |
|
5 |
Bauripada-Radhaballavpur Embkt. on kansabansa Right |
5.00 |
Balasore |
Simulia |
|
|
Sub-Total |
50.40km |
|
|
|
B |
Saline Embankments |
|||
|
1 |
Chandabali-Charadia Saline Embankment on Baitarani left |
15.25 |
Bhadrak |
Chandabali |
|
2 |
Paramanandapur -Charadia Salina Embankment on Baitarani left |
14.75 |
Bhadrak |
Chandabali |
|
3 |
Galia guide saline left embankment |
4.00 |
Bhadrak |
Chandabali |
|
4 |
Galia guide saline Right embankment |
4.00 |
Bhadrak |
Chandabali |
|
5 |
Bahuhariput Saline Embankment on Baitarani left |
11.00 |
Bhadrak |
Chandabali |
|
6 |
Bahuhariput Saline Embankment on Matei right |
7.00 |
Bhadrak |
Chandabali |
|
7 |
Kandha -Neduali Embankment on Baitarani Left |
9.90 |
Bhadrak |
Chandabali |
|
|
Sub -Total |
65.90 km |
- |
- |
|
C |
T.R. Embankments |
|||
|
1 |
Chandaneli-Hendgupati T.R.E on Left bank of river Baitarani& Saiandi |
26.00 |
Bhadrak |
Dhamnagar & Chandabali |
|
2 |
Kaudiiajore TRE on kaudiajore Left Embankment |
3.00 |
Bhadrak |
Chandabali |
|
3 |
Nunajore left T.R.E. on Mantei right |
19.00 |
Bhadrak |
Chandabali |
|
4 |
Nunajore Right T.R.E on Salandi right |
19.00 |
Bhadrak |
Chandabali |
|
5 |
Pirahat-Hengupati T.R.E on Salandi left |
3.00 |
Bhadrak |
Chandabali |
|
6 |
Kelalsahi-Barasar T.R.E. on Salandi Right |
6.00 |
Bhadrak |
Chandabali |
|
7 |
Approach to Biswanathpur Sluice on Mantei right |
2.00 |
Bhadrak |
Chandabali |
|
8 |
Approach to Arjunbindha sluice on Mantei right |
6.00 |
Bhadrak |
Chandabali |
|
9 |
Mantei right T.R.E. from Sagunagadia sluice to Chardia |
10.00 |
Bhadrak |
Chandabali |
|
|
Sub-Total |
97.00 km |
- |
- |
|
|
Grand Total |
213.30 km |
- |
- |
A port from the above this Division looks after the centrally assisted ABP & Salandi Sanskar works under AIBP of IABP. This Division also looks after the F.D.R. natural calamity, Disaster Management , antipoverty, MP, LAD, MLA LAD, NREGS, NABARD Projects for construction, Improvement, Modernization , permanent & temporary restoration of canal system, Creeks, River embankments &Saline embankments etc per the requirement & allotment provision time to time. Out of proposed 108 panipanchayats, 4 Distributary's committee and one apex committee under the jurisdiction of this Division, election process for 102 panipanchayats and 3nos. of Distributary's committee respectively have already been completed and election process for balance 6 panipanchayats, One Distributary's committee and one apex committee will be completed very soon.
All the Panipanchayats are functioning with cooperation & guidance of this division.