Introduction
Background of this Hand-Book (Right to Information Act. 2005):
As per RTI Act-2005 and Odisha RTI Rules,2005.
Objective / Purpose of this Hand-Book:
As per RTI Act-2005 and Odisha RTI Rules,2005.
Who are the Intended users of this hand-books?
As per RTI Act-2005 and Odisha RTI Rules,2005.
Organisation of the information in this hand-book.
As per RTI Act-2005 and Odisha RTI Rules, 2005.
Definitions of various terms used in the handbook.
As per RTI Act-2005 and Odisha RTI Rules, 2005.
Contact person.
As per RTI Act-2005 and Odisha RTI Rules,2005.
Procedure and Fee Structure.
As per RTI Act-2005 and Odisha RTI Rules,2005.
MANUAL-1
Particulars of Organization, Functions & Duties
[Section-4 (1) (b) (i)]
1. Aim & Objectives of the Organization:
After construction of Hirakud Multipurpose Dam Project, Bargarh Canal Division was looking after the operation & maintenance of Bargarh Main Canal and its distribution system covering an ayacut of 82,809.70 Ha. except Godbhaga Distribuary and Attabira Branch Canal under Hirakud Command Area within the revenue jurisdiction of Bargarh, Subarnapur & Bolangir District. Consequent upon restructuring of the Engineering Cadre the Division has been bifurcated into two Divisions namely (i) Bargarh Irrigation Division, Bargarh with command area of 24573.422 Ha. (Bargarh Main Canal from RD 1500' (0.457 km) to RD 155267' (47.325 km) with all its offtakings except Attabira Branch Canal) and (ii) Barpali Irrigation Division, Barpali with command area 58236.258 Ha. (Bargarh Main Canal from RD 155267' (47.325 km) to Tail with all its offtakings). Since the inception of the project and provision of irrigation system the bumper cropping has changed the socio economic condition of the people diametrically and the area is popularly called the Rice Bowel of Odisha.
2. Mission/Vision:
Bargarh Irrigation Division, Bargarh a territorial works division under the establishment control of Additional Chief Engineer, Canal Circle, Burla and technical control of the Chief Engineer & Basin Manager, Mahanadi Basin, Burla is primarily responsible to provide smooth and uninterrupted irrigation to its command area maintaining the canals, structures and a large number of regulatory units, Bargarh Main Canal a water channel of 84.28 km long, the main feeding channel of the ayacut area draws water from Hirakud reservoir through its right dyke. So proper water management is the basic aim and ultimate mission of the division, so as to ensure full and economic utilization of water avoiding its wastage in the present era of water crisis. Due to dwindling position of staff strength and curtailment of maintenance grant, optimum and economic water management has become challenging task. However the sincere, dedicated and target oriented endeavor of our staff have managed to do away with the above hindrance to a great extent. In addition to this the direct involvement of farmers through their organized set up call "Pani Panchayat" is also being emphasized by this division for better out come and efficient water management. Our mission is not only restricted in proper management of irrigation but prioritization is also being given for providing better connectivity by improving the canal service roads. Some roads have been improved/repaired from the funds allocated from different schemes.
3. Brief History and back ground for its Establishment:
Hirakud Multipurpose Dam Project was operated along with supply of irrigation with effect from 1960 and Canal Division, Bargarh was incepted with its head quarter at Bargarh with effect from 1.4.1960 under Odisha State Government for maintenance and supply of irrigation to Hirakud Command area. This division after restructuring is maintaining Bargarh Main Canal from RD 0.457 km to 47.325 km except Attabira Branch Canal through its two Sub-Divisions having their head quarters at Bargarh and Bheden.
4. Organization Chart:
5. Allocation of Business
This division headed with an Superintending Engineer is segmented within 03 (three) nos. of Sub-Divisions under the control of 03 (three) Sub-Divisional Officers one for each sub-division and have been allocated with the work as follows.
(i) Bargarh Canal Sub-Division, Bargarh
This sub-division headed by a Sub-Division Officer has been allocated with the work of maintenance and provision of irrigation to the ayacut area from RD 0.457 km to RD 47.325 km of Bargarh Main Canal with its distribution system except Attabira Branch Canal and Bargarh Distributary for an ayacut of 12407.442 Ha. along with maintenance of residential & non residential building at Bargarh and its section offices. The above works have been entrusted among 04(four) nos. of Junior Engineers / Assistant Engineers.
(ii) Bheden Irrigation Sub-Division, Bheden
This sub-division headed by a Sub-Division Officer has been allocated with the work of maintenance and provision of irrigation to the ayacut area from RD 00 km to RD 29.72 km of Bargarh Distributary with its distribution system for an ayacut of 12166.000 Ha. The above works have been entrusted among 03(three) nos. of Junior Engineers / Assistant Engineers.
(ii) Bargarh Irrigation Sub-Division, Bargarh
This sub-division headed by a Sub-Division Officer has been allocated with the survey and investigation of modernisation & improvement of projects and flood protection works The above works have been entrusted among 04(four) nos. of Junior Engineers / Assistant Engineers.
6. Duties to be performed to achieve the Mission:
This division along with the sub-division except Bargarh Irrigation Sub-Division is doing their assigned jobs i.e. maintenance and provision of irrigation to the ayacut areas and achieves their targets.
7. Details of Services Rendered
(i) Providing irrigation to the command area coming under this Divisional jurisdiction.
(ii) Improvement of canal service roads for providing better connectivity to the rural mass.
(iii) Formation of Pani Panchayats and involving the farmers in water management
(iv) Maintenance of canals for smooth flow of irrigation.

Map:

11. Working Hours:
All days from 10 A.M. to 5.30 P.M. (except lunch break 1.30 P.M. to 2 P.M., Sunday and Public holidays)
12. Public Interaction if any:
Due weightage is being given for public inter action and obtained their valued suggestion for better implementation of government programmes and policies.
13. Grievance/ Redress Mechanism:
Interview hours has been fixed for hearing grievance of the public in the office of the Executive Engineer, Bargarh Canal Division, Bargarh.
|
1 |
Interview hours |
3.30 P.M. to 5.00 P.M. |
|
2 |
Monday |
|
|
3 |
Wednesday |
|
|
4 |
Friday |
8. Citizen's Interaction:
Complains, views, suggestion and demand of the citizens are given utmost care and sincere efforts are being given to attend their needs within the frame work of prevailing rules and regulations.
9. Postal Address:
(i) Division Office
Office of the Superintending Engineer, Bargarh Irrigation Division, Bargarh
At/PO/Dist-Bargarh, PIN-768028 (Odisha)
Ph: 06646-231899
(ii) Sub-ordinate Offices:
(a) Office of the Assistant Executive Engineer,
Bargarh Canal Sub-Division, Bargarh
At/Po/Dist - Bargarh, PIN - 768028 (Odisha)
Ph: 06646 - 256379
(b) Office of the Assistant Executive Engineer
Bheden Irrigation Sub-Division ,Bheden
At/Po -Bheden Dist - Bargarh
(c) Office of the Assistant Executive Engineer
Bargarh Irrigation Sub-Division,Bargarh
At/Po/Dist - Bargarh, PIN - 768028 (Odisha)
10. Map:

MANUAL-2
Powers & Duties of Officers & Employees
[Section - 4 (1) (b) (ii)]
|
Sl. No. |
|
||
|
1 |
Name |
Madan Mohan Sethy |
|
|
Designation |
Superintending Engineer, Bargarh Irrigation Division, Bargarh |
||
|
Power |
Administrative |
Responsible for exercising full technical supervisory and execution, control over all activities in the division office and sub-ordinate offices. |
|
|
Financial |
Financial power relating to the division within limitation specified in OPWD Code Vol-I & II and CPWA codes and codified in delegation of powers |
||
|
Statutory |
Responsible to all power given in the statutory rules and acts like Appointment of Class-IV employee's transfer & posting of Class-Ill & IV employees. Sanction of pensioners benefit to Class-IV employees and other estimate matters etc. |
||
|
To provide technical guidance to the Sub-Divisional Officers in consultation with higher authorities whenever necessary. |
|||
|
To be responsible for all works executed by the sub-divisions under this division in respect of proper quality as per sanctioned plans, design, specifications & estimates. |
|||
|
Others |
Formation of Pan Panchayat & farmers committee |
||
|
To provide technical and water management guidance to their farmers bodies. |
|||
|
To act an abridging unit between the farmers & government in field of various irrigational development. |
|||
|
Duties |
- |
||
|
2 |
Name |
Bijaya Kumar Padhan |
|
|
Designation |
Divisional Accounts Officer |
||
|
Power |
Administrative |
To assist Superintending Engineer, Bargarh Irrigation Division, Bargarh non technical, financial & establishment matters. |
|
|
Financial |
All type of financial and pre-check of scrutiny bills and voucher of the division as per OPWD code Vol-I and II and CPWA code. |
||
|
Statutory |
Responsible to all powers given in the statutory rules and acts in financial matters. Compilation any rendition of monthly accounts for A.G. (A&E), Odisha, Puri |
||
|
Others |
- |
||
|
Duties |
- |
||
|
3 |
Name |
Rajkumar Mishra |
|
|
Designation |
Assistant Executive Engineer (Estimator) I/C |
||
|
Power |
Administrative |
To assist Superintending Engineer, Bargarh Irrigation Division, Bargarh in all technical matters. |
|
|
Financial |
All type of technical works of the division in preparation of estimate, tender & agreement etc. |
||
|
Statutory |
- |
||
|
Others |
Scrutiny of estimate, tender, preparation of design & drawing and other technical matters. |
||
|
Duties |
- |
||
|
4 |
Name |
Supriya Gidhi |
|
|
Designation |
Junior Engineer (Estimator) |
||
|
Power |
Administrative |
To assist Assistant Executive Engineer, Bargarh Irrigation Division, Bargarh in all technical matters. |
|
|
Financial |
All type of technical works of the division in preparation of estimate, tender & agreement etc. |
||
|
Statutory |
- |
||
|
Others |
Estimator |
||
|
Duties |
- |
||
|
5 |
Name |
Suprava Pradhan |
|
|
Designation |
Head Clerk (I/C) |
||
|
Power |
Administrative |
General supervision of Establishment works |
|
|
Financial |
- |
||
|
Statutory |
- |
||
|
Others |
Check and put up all establishment files. |
||
|
Duties |
|
|
|
|
6 |
Name |
Suprava Pradhan |
|
|
Designation |
Senior Assistant |
||
|
Power |
Administrative |
- |
|
|
Financial |
- |
||
|
Statutory |
- |
||
|
Others |
To initiate all files relating to diary and dispatch, Cash section Budget Accounts and Establishment one of the Senior clerk remain in charge of cash. |
||
|
Duties |
|
||
|
7 |
Name |
Post Vacant |
|
|
Designation |
Steno to S.E. Bargrh Irrigation Division Bargarh |
||
|
Power |
Administrative |
- |
|
|
Financial |
- |
||
|
Statutory |
- |
||
|
Others |
Maintenance of Confidential files, take dictation of Superintending Engineer, Bargarh Irrigation Division, Bargarh and typing typing of other letters as desired by Superintending Engineer, Bargarh Irrigation Division ,Bargarh |
||
|
Duties |
- |
||
|
8 |
Name |
Vacant |
|
|
Designation |
Draughtsman |
||
|
Power |
Administrative |
- |
|
|
Financial |
- |
||
|
Statutory |
- |
||
|
Others |
Up keeping of drawings of the division and to assist the Estimators in preparation of drawing etc |
||
|
Duties |
- |
||
|
9 |
Name |
Post Abolished |
|
|
Designation |
Amin |
||
|
Power |
Administrative |
- |
|
|
Financial |
- |
||
|
Statutory |
- |
||
|
Others |
Up keeping of records relating to C.C.A |
||
|
Duties |
- |
||
|
10 |
Name |
Sri Nimai Banchhor |
|
|
Designation |
Daftary |
||
|
Power |
Administrative |
- |
|
|
Financial |
- |
||
|
Statutory |
- |
||
|
Others |
Up keeping of old records and files, lithograph and Xerox Work |
||
|
Duties |
- |
||
MANUAL-3
Procedure Followed in Decision Making Process
[Section- 4 (1) (b) (iii)]
The procedure can be described both in narrative form and through flow process chart. In narrative form the stages through which a proposal passes the levels at which it gets examined and the final authority to which it has together approval may be explained. The flow process charts can give a comprehensive process as may be seen from the following illustration of preparing a food card.
|
Sl. No. |
Activity |
Level of Action |
Time Frame |
|
1 |
2 |
3 |
4 |
|
1 |
To receive application and put a diary number. |
Counter Clerk/ Diarist |
Same day |
|
2 |
To mark application to concern inspector/ Dealing Assistant. |
Head Clerk |
-do- |
|
3 |
Divisional Accounts Officer to put up to Superintending Engineer after scrutiny. |
Dealing Assistant |
2-3 days |
|
4 |
To prepare report and submit to Head Clerk. |
Senior Clerk/ Junior Clerk |
Same day |
|
5 |
Head Clerk to put up to Divisional Accounts Officer |
Head Clerk/Senior Clerk |
2-3 days |
|
6 |
Divisional Accounts Officer to scrutiny and verify the case either return the file to Head Clerk for compliance or put up to Superintending Engineer, Bargarh Irrigation Division, Bargarh for approval/ orders. |
Divisional Accounts Officer |
1 - 3 days |
|
7 |
To approve or reject |
Superintending Engineer, Bargarh Irrigation Division, Bargarh |
1 - 3 days |
MANUAL-4
Norms for Discharge of Functions
[Section-4 (1) (b) (iv)]
|
Sl. No. |
Activity |
Time Frame/ Norm |
Remarks |
|
1 |
2 |
3 |
4 |
|
1 |
Diary of letter |
3 minutes per letter |
Registered dak including entry in messenger book |
|
2 |
Dispatch of letter |
5 minutes per letter |
|
|
3 |
Typing job |
30 pages per day |
MANUAL-5
Rules, Regulations, Instructions, Manuals & Records for Discharging Functions
[Section-4(1) (b) (v)]
|
Sl. No. |
Name of the Act, Rules, Regulation etc. |
Brief list of the Contents |
Reference No. if any |
Price in case of Priced Publications |
|
1 |
2 |
3 |
4 |
5 |
|
1 |
Released regulations
|
Odisha Irrigation Act, PWD code, PW.A. Code, Pani Panchayat Act, R&R Policy, Environment policy, Forest conservation act, State Water Policy and working group guide lines of Government of India. |
- |
Not available in this office for sale
|
|
2 |
Manuals |
Schedule of rates of Irrigation works Department, Hand book of specification for construction of Irrigation Projects, Embankment manual, ISI codes etc. are followed |
- |
-do- |
MANUAL-6
Categories of Documents Under Control
[Section - 4(1) (b) (vi)]
|
Sl. No. |
Nature of Record |
Details of Information Available |
Unit/ Section where Available |
Retention Period, where Available |
|
1 |
2 |
3 |
4 |
5 |
|
1 |
Establishment |
Service particulars of employees |
Regular establishment Section & Wages Establishment Section |
- |
|
2 |
Payment |
Reimbursement of salary, T.E., RCM etc. of staff |
Cash Section |
- |
|
3 |
Designs & Drawings |
Records related to drawing & design |
Drawing Branch |
- |
|
4. |
Estimate, tender & other technical matter |
(1) Sanction of estimate |
-do- |
- |
|
(2) Approval of tender & agreement |
||||
|
(3) All correspondence on works |
||||
|
5 |
Accounts Branch |
All kinds of expenditure and works budget, records and Unserviceable materials, sanction of survey report, allotment of Qrs, records of compilation of accounts, Compliance of S.V.P. Paras, I.R. Paras, PAC report. |
Accounts Branch |
- |
|
6 |
Letter receipt |
Letters received with No. |
Establishment Section |
- |
|
7 |
Letter issue |
All correspondence of the letter With No. & date |
-do- |
- |
|
8 |
Confidential |
Correspondence on all confidential matter |
Head Clerk |
- |
MANUAL-7
Particulars of Arrangement in Formulation of Policy
[Section-4 (1) (b) (vii)]
|
Sl. No. |
Name & Address of the Consultative Committees/ Bodies |
Constitution of the Committee/ Body |
Roles and Responsibility |
Frequency of Meetings |
|
1 |
2 |
3 |
4 |
5 |
|
1 |
Allotment of Qrs. Committee |
Chairman : Superintending Engineer, Bargarh Irrigation Division, Bargarh |
Allotment of all Departmental Qrs. mat Bargarh & different work site |
As and when required |
|
Members: Assistant Executive Engineer, Bargarh Canal Sub-Division, Bargarh Divisional Accounts Officer, Head Clerk |
MANUAL-8
Boards, Councils, Committees & Other Bodies Constituted
[Section-4 (1) (b) (viii)]
MANUAL-9
Directory of Officers & Employees
[Section - 4(1) (b) (ix)]
|
Sl. No. |
Name |
Designation |
STD Code |
Office Phone No. |
Mob no |
|
1 |
2 |
3 |
4 |
5 |
6 |
|
1 |
Madan Mohan Sethy |
Superintending Engineer |
06646 |
231899 |
9437529912 |
|
2 |
Raj Kumar Mishra |
Assistant Executive Engineer |
- |
- |
9437366619 |
|
3 |
Bijaya Kumar Padhan |
Divisional Accounts Officer |
- |
- |
7327859811 |
|
4 |
Pramod Kumar Meher |
Asst Engineer |
- |
- |
9937331830 |
|
5 |
Manmath Satpathy |
Asst Engineer |
- |
- |
8455803335 |
|
6 |
Sanjaya Kumar Pradhan |
Asst Engineer |
- |
- |
7684075975 |
|
7 |
Ranjan Kumar Patel
|
Asst Engineer |
- |
- |
7683933765 |
|
8 |
Smt Susmita Bag |
Assistant Engineer |
- |
- |
9437950426 |
|
9 |
Giridhari Meher |
Junior Engineer |
- |
- |
9777507653 |
|
10 |
Goury Pradhan |
Junior Engineer |
- |
- |
8339079228 |
|
11 |
Subrat Kumar Naik |
Junior Engineer |
- |
- |
7008898569 |
|
12 |
Mutunu Rohidas |
Junior Engineer |
- |
- |
9938952350 |
|
13 |
Sanoj Khadia |
Junior Engineer |
- |
- |
9668383908 |
|
14 |
Supriya Gidhi |
Junior Engineer (Estimator) |
- |
- |
7978293455 |
|
15 |
Dayasagar Chhatar | Senior Assistant | - | - | 9937542890 |
|
16 |
Smt. Suprava Pradhan |
Senior Assistant |
- |
- |
8280048610 |
|
17 |
Nimai Banchhor |
Daftary |
- |
- |
9556790752 |
|
18 |
Smt. Pramodini Rath |
Peon |
- |
- |
9178533703 |
|
19 |
Chhabilata Jena |
Peon |
- |
- |
8847899867 |
MANUAL -10
Monthly Remuneration & Compensation of Officers & Employees
[Section-4 (1) (b) (x)]
|
Sl. No. |
Name |
Designation |
Pay Scale |
Monthly Remuneration |
|
1 |
2 |
3 |
4 |
5 |
|
1 |
Madan Mohan Sethy |
Superintending Engineer |
|
133050 |
|
2 |
Raj Kumar Mishra |
Assistant Executive Engineer |
|
123600 |
|
3 |
Bijaya Kumar Padhan |
Divisional Accounts Officer |
|
66540 |
|
4 |
Pramod Kumar Meher |
Assistant Engineer |
|
120048 |
|
5 |
Manmath Satpathy |
Assistant Engineer |
|
74938 |
|
6 |
Sanjaya Kumar Pradhan |
Assistant Engineer |
|
102000 |
|
7 |
Ranjan Kumar Patel |
Assistant Engineer |
|
72100 |
|
8 |
Smt Susmita Bag |
Assistant Engineer |
|
76450 |
|
9 |
Giridhari Meher |
Junior Engineer |
|
60525 |
|
10 |
Goury Pradhan |
Junior Engineer |
|
54750 |
|
11 |
Subrat Kumar Naik |
Junior Engineer |
|
53100 |
|
12 |
Mutunu Rohidas |
Junior Engineer |
- |
53100 |
|
13 |
Sanoj Khadia |
Junior Engineer |
|
53100 |
|
14 |
Supriya Gidhi |
Junior Engineer (Estimator) |
|
54750 |
|
15 |
Dayasagar Chattar |
Senior Assistant |
|
74606 |
|
16 |
Smt. Suprava Pradhan |
Senior Assistant |
|
80250 |
|
17 |
Nimai Banchhor |
Daftary |
|
40810 |
|
18 |
Smt Pramodini Rath |
Peon |
|
38674 |
|
19 |
Chhabilata Jena |
Peon |
|
25650 |
|
24 |
Thabira Mahapatra |
Peon |
|
34932 |
|
25 |
Rabindra Barik |
Peon |
|
33700 |
|
26 |
Mst. Durbamayee Barik |
Peon |
|
31285 |
|
27 |
Mst. Minati Pradhan |
Peon |
|
29920 |
|
28 |
Nimai Banchhor |
Peon |
|
23457 |
|
29 |
Mst. Pramodini Rath |
Peon |
|
21660 |
|
|
MANUAL-11
Budget Allocated to each Agency
[Section-4 (1) (b) (xi)]
Non Plan Budget:
|
Major Head |
Activities to be Performed |
Sanctioned Budget |
Budget Estimate |
Revised Estimate |
Expenditure for the last Year |
|
1 |
2 |
3 |
4 |
5 |
6 |
|
Demand No.20-2700 Major lrrigation-04-Hirakud Stage-I Project Commercial-101-Maintenance Repair |
Non Plan -Maintenance and repair works with S/R works of canals and distribution systems of Bargarh Main Canal |
361.76 |
361.76 |
|
379.19 |
|
Critical Major |
Improvement and resectioning of canal |
405.00 |
405.00 |
652.02 |
Plan Budget:
|
Name of the plan Scheme |
Activities to be under taken |
Date of Commencement |
Expected date for Completion |
Amount Sanctioned |
Amount Disbursed/ Spent |
|
1 |
2 |
3 |
4 |
5 |
6 |
|
20-4711-Rehabilitation and Renovation of Bargarh Main Canal |
Renovation and rehabilitation of Aqueduct |
May-June |
March-2018 | 281.00 | 281.00 |
MANUAL-12
Manner of Execution of Subsidy Programmes
[Section-4(1) (b) (xii)]
MANUAL-13
Particulars of Recipients of Concessions, Permits or Authorizations Granted
[Section-4 (1) (b) (xiii)]
MANUAL-14
Information Available in an Electronic Form
[Section-4 (1) (b) (xiv)]
|
Sl. No. |
Activities for which Electronic date Available |
Nature of Information Available |
Can it be Shared with Public |
It is Available on Website or is being used as back and date base |
|
1 |
2 |
3 |
4 |
5 |
|
1 |
Tender Notice |
Notice inviting tender for all works costing 10 lakhs & above |
Yes |
www.tendersorissaa.com |
|
2 |
Release of canal water (Information on release of canal water and its closure for Khariff & Rabi irrigation) |
Yes |
Available in electronic media |
MANUAL-15
Particulars of Facilities Available to Citizens for Obtaining Information
[Section-4 (1) (b) (xv)]
|
Sl. No. |
Facility Available |
Nature of Information Available |
Working Hours |
|
1 |
2 |
3 |
4 |
|
1 |
Information counter |
Nil |
- |
|
2 |
Notice Board |
Notice, Tender Notice and Auction Sale Notice |
- |
MANUAL-16
Names, Designations & Other Particulars of the Public Information Officers
[Section-4 (1) (b) (xvi)]
Public Information Officer(PIO):
|
Sl. No. |
Name |
Designation |
Postal Address |
STD Code |
Office Phone No. |
Mob No |
|
1 |
2 |
3 |
4 |
5 |
6 |
7 |
|
1 |
Raj Kumar Mishra |
Asst. Executive Engineer (Estimator I/C) |
Office of the Superintending Engineer, Bargarh Irrigation Division, Bargarh |
06646 |
231899 |
9437366619 |
Asst. Public Information Officer:
|
Sl. No. |
Name |
Designation |
Postal Address |
STD Code |
Office Phone No. |
Mob No. |
|
1 |
2 |
3 |
4 |
5 |
6 |
7 |
|
1 |
Smt. Suprava Pradhan |
Head Assistant (I/c) |
Office of the Superintending Engineer, Bargarh Irrigation Division, Bargarh |
06646 |
231899 |
8280048610 |
First Appellate Authority:
|
Sl. No. |
Name |
Designation |
Postal Address |
STD Code |
Telephone No. |
Mob No. |
|
1 |
2 |
3 |
4 |
5 |
6 |
7 |
|
1 |
Madan Mohan Sethy |
Superintending Engineer |
Office of the Superintending Engineer, Bargarh Irrigation Division, Bargarh |
06646 |
231899 |
9437529912 |
MANUAL-17
Other Useful Information
[Section-4 (1) (b) (xvii)]
All other Information as may be prescribed for discrimination shall be collected, tabulate, compiled, collected and provided in the form of annual form time to time. The Information as may be prescribed will be updated from time to time.
List of PIO & FAA:
Public Information Officer:
|
Sl. No. |
Name |
Designation |
Periods From |
To |
| 1 | 2 | 3 | 4 | 5 |
|
1 |
Nirakar Bishi |
Assistant Engineer (Estimator) |
18.07.2005 |
24.07.2007 |
|
2 |
Rasal Jojo |
Assistant Engineer (Estimator) |
24.07.2007 |
11.07.2014 |
|
3 |
Biswajit Panigrahi |
Assistant Executive Engineer (Estimator) |
06.07.2014 |
08.08.2017 |
|
4 |
Biswajit Panigrahi |
Deputy Executive Engineer (Estimator I/C) |
09.08.2017 |
17.06.2018 |
|
5 |
Rebati Ranjan Mohanty |
Assistant Executive Engineer (Estimator) |
18.06.2018 |
19.06.2023 |
|
6 |
Raj Kumar Mishra |
Assistant Executive Engineer (Estimator I/C) |
19.06.2023 |
Asst. Public Information Officer:
|
Sl. No. |
Name |
Designation |
Periods From |
To |
| 1 | 2 | 3 | 4 | 5 |
|
1 |
K.M.Tripathy |
Head Clerk (I/C) |
16.08.2005 |
23.07.2009 |
|
2 |
G.S.Sah |
Head Clerk (I/C) |
23.07.2009 |
08.01.2010 |
|
3 |
B.L.Harijan |
Head Clerk |
08.01.2010 |
31.01.2013 |
|
4 |
Rajendra Toppo |
Head Clerk |
01.02.2013 |
20.03.2020 |
|
5 |
Dayasagar Chattar |
Head Clerk (I/C) |
20.03.2020 |
06.07.2020 |
|
6 |
G.Vinodkumar |
Head Clerk (I/C) |
06.07.2020 |
07.04.2021 |
|
7 |
Smt. Suprava Pradhan |
Head Clerk (I/C) |
07.04.2021 |
First Appellate Authority:
|
Sl. No. |
Name |
Designation |
Periods From |
To |
| 1 | 2 | 3 | 4 | 5 |
|
1 |
K.C.Agrawal |
Executive Engineer |
04.02.2004 |
30.10.2007 |
|
2 |
P.N.Samantaray |
Executive Engineer |
30.10.2007 |
11.06.2012 |
|
3 |
S.B.Mishra |
Executive Engineer (addl. charge) |
11.06.2012 |
23.08.2012 |
|
4 |
N.N.Nayak |
Executive Engineer |
24.08.2012 |
11.12.2013 |
|
5 |
S.N.Dhal |
Executive Engineer |
09.12.2013 |
19.10.2015 |
|
6 |
N.Bishi |
Executive Engineer |
19.10.2015 |
04.01.2019 |
|
7 |
S.C.Rath |
Executive Engineer |
04.01.2019 |
26.02.2020 |
|
8 |
P.K.Rath |
Executive Engineer |
26.02.2020 |
21.06.2020 |
|
9 |
R.K.Ghadai |
Executive Engineer |
22.06.2020 |
31.12.2020 |
|
10 |
P.K.Rath |
Executive Engineer |
01.01.2021 |
06.01.2021 |
|
11 |
B.Panigrahi |
Executive Engineer |
07.01.2021 |
17.07.2021 |
|
12 |
B.Panigrahi |
Superintending Engineer |
18.07.2021 |
31.05.2023 |
|
13 |
P.K.Rath |
Superintending Engineer |
01.06.2023 |
25.09.2023 |
|
14 |
M.M.Sethy |
Superintending Engineer |
26.09.2023 |