Chief Research Officer, Hirakud Research Station, Hirakud, Sambalpur

Introduction

O/o the Chief Research Officer, Hirakud Research Station, Hirakud, Sambalpur is located at Hirakud, Sambalpur, Odisha.

This office comes under the Department of Water Resources, Govt. of Odisha.

The main function of this institution is to Soil Survey of the borrow area, testing of materials for the construction of earthen and concrete structures.

 

  MANUAL-1 

Particulars of Organization, Functions & Duties

[Section-4 (1) (b) (I)]

1. Aim and Objectives of the Organisation:
Hirakud Research Station is one of the best Research Institute of India on soil mechanics, Foundation Engineering and building materials. It was established in the year 1948 for investigation of foundation of the Hirakud Dam Project. Soil survey of the borrow area, testing of materials for the construction of earthen and concrete structures. It also conducts Soil survey (for agro-irrigation purpose) of its ayacut and for the quality control of construction works. The Research station was also called upon to investigate silt, foundation and building materials of projects like Kusu, Kakrapara, Rajasthan Canals and a number of irrigation projects of Odisha, Madhyapradesh and Assam, steel plant of Bhilai, Rourkela, Indian Aluminium Company (Presently known as HINDALCO) at Hirakud and O.C.L. Rajgangpur.

The Research station was started with Dr. R.C. Hoon as its first Deputy Director, Research. Till 1960 it was functioning under the ministry of Irrigation & Power, Govt. of India.

With the transfer of Stage I of Hirakud Dam Project on 01.04.1960 the Hirakud Research Station came under the Administration of the Deptt. Irrigation & Power, Govt. of Odisha. lt has since then been engaged in prototype observation of Hirakud Dam, especially study of control instruments embedded inside Dam, the behavior of spillway, sedimentation study of Hirakud Researvour, quality control of construction of the stage II of the project and the investigation of the Major Hydro electric and multi purpose project like Balimela. Indrabati, Kolab, Tikarpada & a number of medium Irrigation projects taken up all over Odisha. Staffs of various projects laboratories are trained at Hirakud Research Station.

The station has brought about savings of Millions of Rupees in construction of river valley projects by recommending use of R.R. Massonry in place of concrete in construction of dams, based on test results in a newly devised 2000 tones testing machine, only one of its kind in India. It has developed air-entraining agent in local ingredients, which has been used successfully in concrete and mortar of Hirakud Dam instead of importing the same from abroad. It is the first laboratory in India to embed safety instrument inside the body of the dam and to interpret its observation. It has got the credit of exploration of large steel project of India and Aluminum projects, various river valley projects and quality control of largest dam of the world involving 640 million cft. of earth and sedimentation study of the Hirakud Researvoir, which has the largest water shed in India.

In Water Resources Deptt., Quality Control Organisation, play a vital role for field Engineers to conduct necessary tests in laboratory which is under the quality control organization but also to conduct field tests at site of construction in order to ensure the quality of work for quality assurance.

As such quality control personnels are to act as an interface between design and construction engineers in achieving design objectives in the field. Quality Control is obtained through testing of raw materials in Laboratory as well as in field and end products as also through inspection of workmanship.

Hence the need of systematic scientific approach to quality control is beyond any debate.

2. Mission/ Vision:

This division has been established to achieve standard and qualitative infrastructure through various field and Laboratory tests, is the mission of this quality control organization. On the other hand, to prevent sub standard work in site is another mission of this organization.

 

Various tests for materials like Soil, Cement, Sand, Rock and Rock product and reinforcement are done with in the field and Laboratory. As the quality control organization of S.I.P has no Universal testing machine (U.T.M) for rod test, a digital camera, LCD projector, a computer etc. are to be procure is the vision of this organization for up-gradation of the organization.

 

3. Organizational Set-Up:

i.  Quality control organizations have the following staff at base station.
ii.  Chief Research Officer in the rank of Executive Engineer is the Organizational Head.
iii.  Asst. Research Officer in the rank of A.E (C) to assist Chief Research Officer.
iv.  Senior Technical Assistant for Central Laboratory and to assist A.R.O.
v. Technical Assistant for Central Laboratory as well as for field to conduct various tests.
vi.  Embankment Inspector/Asst. Embankment Inspector for field Laboratory and construction site.
vii.  Laboratory attendant, Work Sarkar
viii.  Mazdoor and Khalasi.

 

4. Schematic Diagram of Hirakud Research Station, Hirakud:

1. Jr.  Engineer - 1 No.

N.B: Field staff such as E.I/A.E.I may be posted to this Division at least for 6 to 9 nos. to work under A.R.O's due to present work load of the Division.

 

5. Allocation of Business:

This division is assigned to conduct various tests such as soil, cement, sand, rock and rock product in the Laboratory and in the execution site.

 

6. Duties to be Performed to achieve the Mission:.

This Division is created for supervision of the Quality Control works of all sites in the project along with the Basin under its control. This Division is supposed to view the lapse in quality of any component to be executed in the site. The quality control work covers keeping a view with close contact with Design Cell, Engineer-in-Charge, suggesting for modification of design, specification basing on the actual site condition and immediate action and rectification if any required.

7. Details of Services Rendered:

The services to be rendered as per the quality control procedure is divided in to two parts i.e. (1) Pre-construction stage of quality Control (2) Construction stage of Quality control.

Part-1 - Pre-construction stage of quality Control envisages investigation of foundation and construction materials for construction of earth dam, canals and allied structures. This comprises of exploration of foundation to determine location and physical characteristics (Strength, Permeability etc) of various earth and rocks strata which comprises structural foundation and abutment. The procedure of survey (sampling and testing) the borrow area for soil/sand and rock and rock product is being done by Central Laboratory Staff.

Part-2 - Construction stage of Quality control - Quality control during the construction aims and ensures the design as envisages in plans and specifications is fulfilled at site.

Those in which the requirement are definite and can be measured in the laboratory tests, such as placement of filter materials of adequate sizes and ranges etc.

Those which have indefinite and required interpretation, judgment and construction experience. The category may include draining cut the site before starting and filling operations, base preparation procedure for compacting the impervious soil etc.

As a whole the services precisely being rendered by this organization is detailed below:

Design Mix:

According to various designs mix M10, M15, M20. The proportionate weight of cement, fine aggregates and coarse aggregates and w/c i.e water control.

Aggregate Test:

Fine: Sieve analysis, to know fine modulus of (various Zone) sand and volumetric method to conduct sieve content.

Coarse: Sieve analysis, to know fine modulus of (various zone) and specific gravity i.e grading of aggregate

Abrasion & Attrition Test: Is being done for coarse aggregates. Flakiness index. Angularity number & Elongation Index for road project & concrete pavements & allied structures, Bulk density & voids, crushing value, ten percent fines value, Organic impurities.

a. We are providing services of conducting various tests of soils, cement and aggregates.

b.    The following tests of soil as below:

Cement:

i. (CPNC) Consistency of cement to know initial & final setting time of cement.

ii. Compressive strength test of cement according to it's grade, soundness test of cement, specific surface of cement to know fineness of cement by Seive test

iii. Fineness of cement to know specific surface cement.

iv. Chemical composition test.

Water -Different tests on water in chemical Labarotory is conducted, few are mentioned below.

a. PH Value

b. Turbidity

c. Total Dissolved solids

d. Electrical conductivity.

e. Total alkanity

f. Phenol alkanity

g. Hardness in terms of  HCo3-, Co3=, CL-, S04=, Ca++, Mg++

8. Citizens Interaction:

Citizens are supposed to be involved in matters of Quality Control Organisation directly or indirectly by means of testing the Kachha or Pucca house hold materials such as Brick, sand, cement, chips, metal, moorum, steel and by depositing the testing charges fixed by the Government of Odisha, W.R Deptt. Soil test can also provided for designing the foundation infrastructure.

9. Postal Address of the Main office, Attached/ Subordinate Office/ Field Units etc.:

Chief Research Officer,
Hirakud Research Statio
n, At/Po.- Hirakud, Dist.- Sambalpur,
PIN- 768016

10. Working Hours both for Office and Public:

The office hours is from 10 A.M. to 5 P.M. with lunch break from 1.30 P.M. to 2.00 P.M. and in summer season from 7 A.M. to 1 P.M. without lunch break from the month of April 10 to June 14 generally.

11. Public Interaction if any:

Public Interaction take place in the Quality Control Organisation directly or indirectly in the case of testing of various materials such as soil, cement, Sand, rock, rock product and bricks etc.

12. Grievance Redress Mechanism:

It does not applicable to this Organization.

  MANUAL-2 

Powers & Duties of Officers & Employees

[Section-4 (1) (b) (ii)]

Sl. No.


1

Designation

Chief Research Officer

Power

Decision making authority regarding implementation of Govt. policy and execution of work and Govt. administrative Head of Divisional estt.

He can sanction all personal claims and disburse each payment to the staff working under his control as power conferred upon by Deptt. of Water Resources.

Taking decision regarding implementation of Govt. policy and execution of work and Govt. administration and Sub-Divisional office   Estt

He can approve and sanction all personal claims of W/C staff and N.M.R personnel and also disburse the payment of W/C

N.M.R personnel working under his control.

Duties

He supervises Quality Control works of all sites in the project and Basin under his control

Regarding in lapse in quality of any component of the project, he shall report to the concerned construction Engineer-in-Charge and the Chief Engineer for immediate action and rectification.

He shall visit each construction site at least once in a month and give report to all concerned.

He shall also keep close contact with Design cell, Engineer-in-Charge and suggest any modification of design specification basing on the actual site condition if required.

At the end of working season he shall prepare quality control report in respect of each site of the project and Basin and submit the same to the Chief Engineer, concerned

He shall assist the Director, Research & Quality Control in all his duties and take up the laboratory study of different materials of construction as well as post construction testing of samples taken from different component to verify the actual condition  achieved.

He should ensure proper interpretation test results in context with the design specification. He should co-ordinate and supervises different tests in the Laboratory and site.

2

Designation

Asst. Research Officer-I (In the rank of Asst. Ex. Engineer)

Power

Decision making authority regarding implementation of Govt. policy and execution of work and Govt. administrative Head of Divisional estt.

He can sanction all personal claims and disburse each payment to the staff working under his control as power conferred upon by Deptt. Of Water Resources.

Taking decision regarding implementation of Govt. policy and execution of work and Govt. administration and Sub-Divisional office   Estt

He can approve and sanction all personal claims of W/C staff and N.M.R personnel and also disburse the payment of W/C and

N.M.R personnel working under his control.

Duties

He supervises Quality Control works of all sites in the project and Basin under his control

Regarding in lapse in quality of any component of the project, he shall report to the concerned construction Engineer-in-Charge and the Chief Engineer for immediate action and rectification.

He shall visit each construction site at least once in a month and give report to all concerned.

He shall also keep close contact with Design cell, Engineer-in-Charge and suggest any modification of design specification basing on the actual site condition if required.

At the end of working season he shall prepare quality control report in respect of each site of the project and Basin and submit the same to the Chief Engineer, concerned

He shall assist the Director, Research & Quality Control in all his duties and take up the laboratory study of different materials of construction as well as post construction testing of samples taken from different component to verify the actual condition  achieved.

He should ensure proper interpretation test results in context with the design specification. He should co-ordinate and supervises different tests in the Laboratory and site.


Sl. No.

 

3

Designation

Asst. Research Officer-II (In the rank of Asst. Ex. Engineer)

Power

Decision making authority regarding implementation of Govt. policy and execution of work and Govt. administrative Head of Divisional estt.

He can sanction all personal claims and disburse each payment to the staff working under his control as power conferred upon by Deptt. Of Water Resources.

Taking decision regarding implementation of Govt. policy and execution of work and Govt. administration and Sub-Divisional office   Estt

He can approve and sanction all personal claims of W/C staff and N.M.R personnel and also disburse the payment of W/C and

N.M.R personnel working under his control.

Duties

He supervises Quality Control works of all sites in the project and Basin under his control

Regarding in lapse in quality of any component of the project, he shall report to the concerned construction Engineer-in-Charge and the Chief Engineer for immediate action and rectification.

He shall visit each construction site at least once in a month and give report to all concerned.

He shall also keep close contact with Design cell, Engineer-in-Charge and suggest any modification of design specification basing on the actual site condition if required.

At the end of working season he shall prepare quality control report in respect of each site of the project and Basin and submit the same to the Chief Engineer, concerned

He shall assist the Director, Research & Quality Control in all his duties and take up the laboratory study of different materials of construction as well as post construction testing of samples taken from different component to verify the actual condition  achieved.

He should ensure proper interpretation test results in context with the design specification. He should co-ordinate and supervises different tests in the Laboratory and site.

4

Designation

Asst. Research Officer-III (In the rank of Asst. Engineer)

Power

 

Duties

Supervision of sites and in charge of execution of work done departmentally or by private agency. Keeping all initial records like Specification, measurement e of all the works executed in the Division.

5

Designation

Asst. Research Officer-IV (In the rank of Asst. Engineer)

Power

 

Duties

Supervision of sites and in charge of execution of work done departmentally or by private agency. Keeping all initial records like Specification, measurement etc. of all the works executed in the Division.

Sl. No.

 

6

Designation

Asst. Engineer-I

Power

 

Duties

Supervision of sites and in charge of execution of work done departmentally or by private agency. Keeping all initial records like Specification, measurement etc. of all the works executed in the Division

7

Designation

Asst. Engineer-II

Power

.

Duties

Supervision of sites and in charge of execution of work done departmentally or by private agency. Keeping all initial records like Specification, measurement etc. of all the works executed in the Division

8

Designation

Asst. Engineer-III

Power

.

Duties

Supervision of sites and in charge of execution of work done departmentally or by private agency. Keeping all initial records like Specification, measurement etc. of all the works executed in the Division

9

Designation

Junior Engineer (1 No.)

Power

 

Duties

Supervision of sites and in charge of execution of work done departmentally or by private agency. Keeping all initial records like Specification, measurement e of all the works executed in the Division

10

Designation

Technical Assistant

Power

 

Duties

He is the head of the Laboratory personnels and directly co-ordinate Assistant Research Officer. He shall directly conduct Laboratory tests and is responsible for all tests conducted in the Laboratory. He ensure proper storage samples and materials brought to the Laboratory for testing. He shall interpret the test results and the same to the Asst. Research Officer.

11

Designation

Embankment Inspector/ Analyst/ Silt Analyst

Power

 

Duties

He is primarily responsible for quality of all materials in the different components at the work and workmanship and specification.

He shall report everyday to Asst. Research Officer at least once regarding the quality of work in progress.

He shall collect samples in the field land, properly pack them and transport to either field or base (Central) Laboratory.

He shall report and discrepancy in quality to the construction Engineer at the site immediately for specification.

12

Designation

Junior Lab. Asst./Asst. Embankment Inspector

Power

 

Duties

He shall assist the Technical Asst. in all his duties to conduct the various tests in Laboratory.

Sl. No.

 

13

Designation

Lab. Attendant

Power

 

Duties

He shall attend to the duties of the Lab. Asst. at the time of all testing conducted at the Laboratory.

14

Designation

Photographer

Power

 

Duties

He shall take photographs of different construction sites such as Dam, VRB & Super Passage, Aqueduct etc.

15

Designation

Head Clerk & Accountant

Power

 

Duties

Supervising work of Juniors in all Estt. Matters and management of staff and office. Scrutiny and checking of all accounts transaction including cash finance, accounts placed before him by subordinates.

16

Designation

Sr. Clerk

Power

 

Duties

Preparation of notes on various important matters regarding implementation of Govt. policy execution of work and placement of files with suggestion to Head Clerk and Divisional Accountant

17

Designation

Jr. Clerk

Power

 

Duties

Preliminary scrutiny and examination of papers and documents relating to office budget, salary of staff bills and accounts and placing the files before Head Clerk with suggestion.

18

Designation

Peon

Duties

For transit of files/bills etc. from table to table and other orderly tasks.

19

Designation

Asst. Embankment Inspector/Asst. Silt Analyst (Wages)

Power

 

Duties

He shall assist the Technical Asst in all his duties to conduct the various tests in Laboratory/construction site.

20

Designation

Masson (Wages)

Power

 

Duties

Performed the duty in concrete laboratory & other works.

Sl. No.

 

21

Designation

Carpenter (Wages)

Duties

Carrying out the repairing Works & other miscellaneous work.

22

Designation

Driver ( Wages)

Duties

Performed the duty of vehicles.

23

Designation

Fitter (Wages)

Duties

Assist in the duty of various machinery work/ fitting work in the Laboratories.

24

Designation

Laboratory Attendant (Wages)

Duties

Assist to the duties of the Laboratory Asst. at the time of testing conducted at the Laboratory

25

Designation

Work Sarkar (Wages)

Duties

Assist at the time of testing work in the Laboratory & other work such as deployed to field to monitor Mazdoor/Mate.

26

Designation

Mate (Wages)

Duties

Assist at the time of testing work in the Laboratory & other work.

27

Designation

Mali (Wages)

Duties

Performing the duty in Garden for flowering, watering & Other work.

28

Designation

Oilman (Wages)

Duties

Performing the duty in launch & Other work

29

Designation

Helper Gr.I

Duties

Assist at the time of testing work in the Laboratory & other work

30

Designation

Helper Gr.II

Duties

Assist at the time of testing work in the Laboratory & other work

31

Designation

Mazdoor

Duties

Assist at the time of testing work in the Laboratory & other work

32

Designation

Chowkidar

Duties

Performing the duty of watch & ward in the various sites

  MANUAL-3 

Procedure Followed in Decision Making Process

[Section-4 (1) (b) (iii)]

1. What is the Procedure followed to take a decision for various matters ? (A reference to Secretariat Manual and Rule of Business Manual and other Rules/ Regulations etc. can be made).

The procedure can be described both in narrative from and through flow process chart. In narrative form the stages through which a proposal passes, the levels at which it gets examined and the final authority to which it has to go for approved may be explained.

This Organisation is assigned to take decision regarding the quality to ensure in achieving design objectives in the site of execution and the Engineers to maintain the quality assurance well in discussion with the Chief Engineer, Design, Research & Quality Control, Bhubaneswar.

  MANUAL-4 

Norms for Discharge of Functions

[Section-4 (1) (b) (iv)]

Sl. No.

Activity

Time Period/ Norm

Remarks

1

2

3

4

1

Norms set for discharge of functions

O.P.W.D. Code Vol. I and Vol. II, CPWA code of Conduct books and circulars followed

 

  MANUAL-5 

Rules, Regulations, Instructions, Manuals & Records for Discharging Functions

[Section-4 (1) (b) (v)]

Sl. No.

Name of the Act, Rules, Regulations etc.

Brief Gist of the Contents

Reference No., if any

Price in case of Priced Publications

1

2

3

4

5

1

O.P.W.D Code Vol-I

For execution of works (State Govt)

 

85

2

O.P.W.D Code Vol-II

For execution of works (State Govt)

 

 

3

O.P.W.A Code

For execution of works (Central Govt)

 

50

4

O.G.F.R, Vol-I & II

Financial Rules

 

50

5

O.T.C Vol-I & II

Treasury functioning rules

 

135

6

Odisha Service Code

Service Condition

 

270

7

Odisha Leave Rules 1996

Leave applicable to employee

 

30

8

Odisha T.A. Rules

Traveling Rules

 

110

9

Odisha pension Rules

Pension Rules

 

90

10

G.P.F (O) Rules

P.F. deduction Rules

 

15

11

Odisha Govt. Servants conduct Rules

Conduct rules for employees

 

 

12

Odisha Record Manual

Maintenance of office records and duties of employee

 

 

13

F.A & C.A.O and Hand Book for Engineering Project

Method of Transaction and accounting procedure for major Irrigation Project

 

 

14

Appointment & Service condition of Work-Charge employees

Govt. circular

 

 

15

Schedule of Rates

 

 

20

16

Disciplinary Proceedings

 

 

55

17

Odisha Medical Attendance Roll

 

 

20

18

Odisha Survey & Settlement Manual

 

 

28

19

New Sale Tax law

 

 

15

20

Odisha Civil Service Reh. Asst. Rule-1990

 

 

30

21

Payment of Wages Act

 

 

15

22

Industrial Dispute

 

 

10


  MANUAL-6 

Categories of Documents Under Control

[Section-4 (1) (b) (vi)]

Sl. No.

Nature of Record

Details of Information Available

Unit/ Section Where Available

Retention Period Where Available

1

2

3

4

5

1

Estt. Related documents

Files related to office estt. Like personal file, service book, G.l.S Pass book, GPF pass book, General correspondence, Pay acquaintance roll, T.A. acquaintance role, R.C.M. acquaintance roll and estt. Bill register and etc. & Dead stock, Hot weather etc.

Establishment Branch

 

2

Cash related documents

Subsidiary cash book, Emergent advance, Cash book, Permanent Imprest Cash Book, EPF Cash Book, P.W, Receipt of revenue collection, Cheque Book, Unpaid register and other cash matters

Cash Branch

 

3

Estimating Documents

All estimates

Estimating Branch

 

Tender opening register

Purchase order Register

Agreement Register

Quotation call notice Register

Tender Call Notice Register

Sanction Estimate Register

Quotation Opening Register

Tender Sale Register

4

Accounts and Works Documents

Works bill Register

 

 

Vouchers relating to work

All Court Cases

Work Charge Correspondence

N.M.R Correspondence

I. R .Para, CAG Report, Vigilance report etc

5

Diary and Issue

Diary Register

 

 

Issue Register

Postage Stamp A/C register

Library Book

Peon Book


  MANUAL-7 

Particulars of Arrangement in Formulation of Policy

[Section-4 (1) (b) (vii)]

  MANUAL-8 

Boards, Councils, Committees & Other Bodies Constituted

[Section-4 (1) (b) (viii)]


MANUAL-9 

Directory of Officers  & Employees

[Section - 4(1) (b) (ix)]l.

Sl.

Name

Designation

Office Ph. No.

Mobile No.

E-mail

Address

1

2

3

4

5

7

8

1

Er. Debarchan Bhoi     

 Chief Research Officer

-

9439394851

-

Chief Research Officer, Hirakud Research Station, Hirakud, Sambalpur

2

Er  Simanchal Sahu

Asst. Research Officer (3 Nos)

-

-

-

-

3

Vacant

JE in the rank of A.E( 2 Nos)

-

-

-

-

4

Er  Saheen Nazar

Jr. Research Officer (2 Nos.)

-

-

-

-

5

Vacant  

Head Clerk

-

-

-

-

6

Akshaya Ku. Dash

Senior Clerk

-

9861272265

-

-

7

Chandrakanta Das 

Senior Clerk

-

-

-

-

8

Vacant  

Jr. Clerk 

-

-

-

-

9

Vacant  

Jr. Clerk

-

-

-

-

10

Vacant  

Jr. Clerk

-

-

-

-

11

Vacant  

Jr. Clerk

-

-

-

-

12

Vacant  

Jr. Clerk

-

-

-

-

13

Vacant  

Steno

 

 

 

 

14

R.N. Budek

Silt Analyst

-

-

-

-

15

A.K. Supka

Silt Analyst

-

-

-

-

16

Malaya Ku.Dash

Tech. Asst.  

-

-

-

-

17

Subash Ch. Majhi  

Tech. Asst.  

-

-

-

-

18

Mangaraj Panda

E.I  

-

-

-

-

19

Bijay Ku Soreng

E.I  

-

-

-

-

20

Vacant 

Asst. E.I.

-

-

-

-

21

Vacant 

Asst. E.I.

-

-

-

-

22

Ashok Ku.Pattnaik

Lab. Asst.( 4 Nos)

-

-

-

-

23

Vacant 

Lab. Asst.  

-

-

-

-

24

Vacant 

Lab. Asst.  

-

-

-

-

 

Sl.

Name

Designation

Office Ph. No.

Mobile No.

E-mail

Address

1

2

3

4

5

6

7

25

Vacant

Lab. Asst.

-

-

-

Chief Research Officer, Hirakud Research Station, Hirakud, Sambalpur

26

Vacant

Lab. Attendant

-

-

-

-

27

Vacant

Lab. Attendant

-

-

-

-

28

Vacant

Lab. Attendant

-

-

-

-

29

Vacant

Lab. Attendant

-

-

-

-

30

Vacant

Photographer

-

-

-

-

31

Sudanya Mallik

Peon

-

-

-

-

32

Philman Barla

Peon

-

-

-

-

33

Rangalata Nayak

Peon

-

-

-

-

34

Sukanta Rout

Peon

-

-

-

-

35

Mahadev Nanda

Peon

-

-

-

-

 

  MANUAL-10 

Monthly Remuneration & Compensation of Officers & Employees

[Section-4 (1) (b) (x)]

Sl.

Name

Designation

Grade Pay (in Rs.)

1

2

3

4

1

Er. Debarchan Bhoi     

 Chief Research Officer

6600

2

Er  Simanchal Sahu

Asst. Research Officer (3 Nos)

5400

3

Vacant

JE in the rank of A.E( 2 Nos)

4600

4

Er  Saheen Nazar

Jr. Research Officer (2 Nos.)

4200

5

Vacant  

Head Clerk

4200

6

Akshaya Ku. Dash

Senior Clerk

2400

7

Chandrakanta Das 

Senior Clerk

2400

8

Vacant  

Jr. Clerk 

1900

9

Vacant  

Jr. Clerk

1900

10

Vacant  

Jr. Clerk

1900

11

Vacant  

Jr. Clerk

1900

12

Vacant  

Jr. Clerk

1900

13

Vacant  

Steno

2400

14

R.N. Budek

Silt Analyst

4200

15

A.K. Supka

Silt Analyst

4200

16

Malaya Ku.Dash

Tech. Asst.  

4200

17

Subash Ch. Majhi  

Tech. Asst.  

4200

18

Mangaraj Panda

E.I  

4200

19

Bijay Ku Soreng

E.I  

4200

20

Vacant 

Asst. E.I.

2400

21

Vacant 

Asst. E.I.

2400

22

Ashok Ku.Pattnaik

Lab. Asst.( 4 Nos)

2400

23

Vacant 

Lab. Asst.  

2400

24

Vacant 

Lab. Asst.  

2400

Sl.

Name

Designation

Grade Pay (in Rs.)

1

2

3

4

25

Vacant

Lab. Asst.  

2400

26

Vacant 

Lab. Attendant

1750

27

Vacant

Lab. Attendant

1750

28

Vacant 

Lab. Attendant

1750

29

Vacant

Lab. Attendant

1750

30

Vacant

Photographer

2400

31

Sudanya Mallik

Peon

1500

32

Philman Barla

Peon

1500

33

Rangalata Nayak

Peon

1500

34

Sukanta Rout

Peon

1500

35

Mahadev Nanda  

Peon

1500

  MANUAL-12 

Manner of Execution of Subsidy Programmes

[Section-4 (1) (b) (xii)]

Details of scheme under which subsidies are granted should be given

 

  MANUAL-13 

Particulars of Recipients of Concessions, Permits or Authorizations Granted

[Section-4 (1) (b) (xiii)]

  MANUAL-14 

Information Available in an Electronic Form

[Section-4 (1) (b) (xiv)]

  MANUAL-15 

Particulars of Facilities Available to Citizens for Obtaining Information

[Section-4 (1) (b) (xv)]

Sl. No.

Facility Available

Nature of Information Available

Working Hours

1

2

3

4

1

Information Counter

 

 

2

Website

 

 

3

Library

 

 

4

Notice Board

 

 


  MANUAL-16 

Names, Designations & Other Particulars of the Public Information Officers

[Section-4 (1) (b) (xvi)]

Asst. Public Information Officer (APIO):

Sl.

Name

Designation

Mobile No.

E-mail

Address

1

2

3

4

5

6

1

Akshaya Ku.Dash

Senior Clerk

-

-

O/o. the Chief Research Officer, Hirakud Research Station, Hirakud, Sambalpur

 Public Information Officer (PIO):

Sl.

Name

Designation

Office Ph. No.

Mobile No.

Fax

E-mail

Address

1

2

3

4

5

6

7

8

1

Er. Simanchala Sahu

Asst. Research Officer

0663
2481287

-

-

-

O/o. the Chief Research Officer, Hirakud Research Station, Hirakud, Sambalpur

 First Appellate Authority (FAA):

Sl.

Name

Designation

Office Ph. No.

Mobile No.

Fax

E-mail

Address

1

2

3

4

5

6

7

8

1

Er. Debarchan Bhoi

Chief Research Officer

0663
2481287

9439394851

-

-

O/o. the Chief Research Officer, Hirakud Research Station, Hirakud, Sambalpur

  MANUAL-17 

Other Useful Information

[Section-4 (1) (b) (xvii)]

Content for this page yet to be publishedContent for this page yet to be published