Odisha Hydro Power Corporation Limited, Bhubaneswar

Introduction

Background of this Hand-Book ( Right to Information Act. 2005):

As per RTI Act-2005 and Odisha RTI Rules,2005.

Objective / Purpose of this Hand-Book:

As per RTI Act-2005 and Odisha RTI Rules,2005.

Who are the Intended users of this hand-book?

As per RTI Act-2005 and Odisha RTI Rules,2005.

Organisation of the information in this hand-book.

As per RTI Act-2005 and Odisha RTI Rules, 2005. 

Definitions of various terms used in the handbook.

As per RTI Act-2005 and Odisha RTI Rules, 2005.

Contact person.

As per RTI Act-2005 and Odisha RTI Rules,2005.

Procedure and Fee Structure.

As per RTI Act-2005 and Odisha RTI Rules,2005.

 

  MANUAL-1 

Particulars of Organization, Functions & Duties

[Section-4 (1) (b) (i)]

1. Aims and objectives of the   organization

To establish, operate, maintain, renovate & modernize hydro, thermal and other form of power Generating station besides owning, developing and operating coal mines for supply of fuel to the thermal power stations.

2. VISION

To be a leading power utility in the energy sector through diversified energy portfolio with due care & concern to the environment.

3. MISSION

Consequent to reforms and restructuring the power sector in Odisha under the Reform Act, 1995, Odisha Hydro Power Corporation Ltd. (OHPC), a Government of Odisha undertaking was incorporated under the Companies Act, 1956 on 21st April 1995. Subsequently, thereafter the hydro power assets owned and operated by the Govt. of Odisha (GoO).

In 27 (Twentee Seven) years of its functioning since 1996, it could complete New/RM&U Projects resulting in capacity addition of 802.3 MW. The present installed capacity of Hydro stations under OHPC is 2099.8 MW including 50% shares in Machhkund Hydro Electric Project, a joint project of Govt. of Andhra Pradesh and Govt. of Odisha. The efficient management of hydro power stations has resulted in providing the cheapest electricity to the people of Odisha. OHPC plays important role in maintaining Grid discipline under ABT regime for the Eastern Regional Grid by providing peak support.

5. Allocation of Business

Corporate office provided policy guidelines, approvals & looks after overall management and administration including mobilization of resources and allocation to the units. The Units are responsible for the establishment, operation, maintenance, renovation & modernization and expansion of the Power Projects.

6. Duties to be performed to achieve the mission

The respective branches namely technical finance and human resources are functioning efficiently under the directions of the Board of Directors for achieving the mission.

 

  1. Details of services rendered
  2. A. Operating the following Hydro Power Stations

Sl

Hydro power stations

Installed Capacity (MW)

1

2

3

1

Balimela Hydro Electric Project

510.00

 2

Hirakud Hydro Electric Project

287.80 (From 09.01.2022)

3

Chiplima Hydro Electric Project

72.00

4

Rengali Hydro Electric Project

250.00

5

Upper Kolab Hydro Electric Project

320.00

 6

Upper Indravati Hydro Electric Project

600.00

7

Machkund HE Project

60.00

 

Total

2099.80 (From 09.01.2022)

B. NEW PROJECTS

OHPC intends to develop the following 3 nos. Pump Storage Projects and 02 nos. of Hydroelectric Projects. The DPR preparation work of following Projects are in progress through WAPCOS.

PUMPED STORAGE PROJECTS (PSPs)

New Hydro Electric Projects

63 MW. WAPCOS submitted inception report, Topography Survey Report. Further study will be carried out after getting the forest clearance and in principle approval from DoWR, Govt. of Odisha.

finalized). WAPCOS submitted the conceptual layout report. Further study will be carried out after getting in principle approval from DoWR, Govt. of Odisha.

  1. Setting up thermal power plant in joint venture.

According to the directions of the Govt. of Odisha, the Corporation in joint venture with Odisha Mining Corporation Ltd (having 50:50 share) has formed a company namely Odisha Thermal Power Corporation Ltd (OTPCL) to set up a 2000 MW thermal power plant. Preliminary works like site selection, schedule of land, approval for water allocation etc are in progress.

B. Development of Baitarni West Coal Block.

The Ministry of Coal (MoC), Govt. of India vide letter dtd. 25.07.2007 have allotted the Baitarni West Coal Block having explored deposit of 602 Million Tonnes of coal jointly in favour of Odisha Hydro Power Corporation Ltd,(OHPC) Gujarat Power Corporation Ltd (GPCL) and Kerala State Electricity Board (KSEB). A joint venture Company namely Baitarni West Coal Company Ltd has been formed under the Companies Act, 1956 on 22.04.2008. The mining plan has been approved by the MoC. The clearances required for the development of the coal block as per the milestones stipulated by the Ministry of Coal (MoC) , Govt. of India is in progress.

C. List of Upcoming Projects of OHPC :

Sl No Project Name  Location Capacity
1 2 3 4
1 Upper Indravati Pumped Storage Project Near the existing Upper Indravatii Hydro Electric Project in Kalahandi district 600 MW
(4 x150 MW)
2 Upper Kolab Pumped Storage Project Near the existing Upper Kolab Hydro Electric Project in Koraput district 320 MW
(2 x160 MW)
3 Balimela Pumped Storage Project Near the existing Balimela Hydro Electric Project in Malkanagiri  District 500 MW
(2 x 250 MW)
4 Kharag Hydro Electric Project Kandhamal District 63 MW
(3 x 21 MW)
5 Salki Hydro Electric Project Boudh District Not Yet Finalised Preliminary Indication 44 MW


D. GEDCOL :

Green Energy Development Corporation of Odisha Ltd., (GEDCOL) has been formed as a Public Limited 100% subsidiary company of Odisha Hydro Power Corporation Ltd., (OHPC) in March 2013. GEDCOL has completed one 20 MW ground mountain solar PV project at Manmunda in Boudh District and 4 MW grid connected rooftop solar PV project on government buildings in Bhubaneswar & Cuttack cities. Further, multi-city grid connected rooftop solar PV project of 18.8 MW capacity, ground mounted solar projects on the un-utilised lands available in OPTCL grid sub-station at Baripada, New Bolangir and Jayanagar & OHPC Power House of Mukhiguda and GEDCOL Solar Power Plant at Manmunda for 8 MW capacity and 275 MW Solar Park at Jujumora, Sambalpur and Kantamal, Boudh are in pipeline. In Small Hydro Projects, GEDCOL is taking up 10 MW Mandira on JV mode with SAIL and has prepared DPRs & Tender specifications for Kanupur SHEP (4.2 MW) in Keonjhar and Jambhira SHEP (3 MW) in Mayurbhanj District

 

9. Citizen’s interaction:

Through news paper advertisement, the public are informed about the tariff proposal of OHPC. The public who are interested, submit their views to the OERC. The public with genuine submissions are given opportunity to participate in the public hearing by the OERC with regard to the fixation of tariff.

10 .Postal address of the main office, attached / subordinate office / field units etc.
1. Odisha Hydro Power Corporation Ltd.

1st Floor of Odisha State Police Housing & Welfare Corporation Building Vani Vihar Chowk, Janpath,   
Bhubaneswar-751022

2. Unit Head:
Hirakud Hydro Electric Project,
At/Po-Burla,
Dist-Sambalpur - 768017

3. Unit Head:
Chiplima Hydro Electric Project
At/Po - Chiplima
Dist - Sambalpur - 768025.

4. Unit Head:
Rengali Hydro Electric Project At/Po-Rengali Dam Site,
Dist - Angul - 759105

5. Unit Head:
Balimela Hydro Electric Project,
At/Po- Balimela,
Dist - Malkangiri - 764006.

6. Unit Head:
Upper Kolab Hydro Electric Project,
At/Po- Bariniput, (Jeypore),
Dist - Koraput - 764006.

7. (a) Unit Head:
Upper Indravati Hydro Electric Project,
At/Po-Mukhiguda
Dist - Kalahandi - 766026.

(b) Chief Construction Engineer & Project Manager Upper Indravati Hydro Electric Project
At/Po- Khatiguda
Dist - Nawarangpur - 764085

11. Map of office location

The Corporate office of OHPC is located near Vanivihar Chowk behind Dy. Commissioner of Police Office & functioning at Odisha State Police Housing & Welfare Corporation Building. The Units are located at the places mentioned above.

12. Working hours both for office and public

10.00 A.M. to 5.30 P.M. Monday to Saturday. The Office is closed on Sundays, second Saturdays, fourth Saturdays and holidays declared by OHPC.

13. Public interaction, if any

Public interaction is made in the hearings of the submission / petitions taken up by OERC.

14 . Grievance redress mechanism

Forums exist in the Organization at Corporate office and Units for redressal of the grievances. The application with details of grievances may be submitted at the Corporate Office or at the Units which are heard and settled on merit

15. Organization Chart: [ClickHere]

  MANUAL-2 

Powers & Duties of Officers & Employees

[Section-4 (1) (b) (ii)]

Sl.

Designation of Post

Powers Duties

Duties

attached

Administrative

Financial

Statutory

Others

Discipline

1

Board of Directors

Full Power subject to the approval of the State Government on certain policy issues.

 

 

 

2

C.M.D /

Managing Director

Chief Executive of the Organization

 

3

Director (Finance)

Head of Finance discipline and exercises control over finance functions

Finance, Accounts & Audit.

4

Director (Operation)

Head of Technical discipline and exercises control over technical functions.

Operation and maintenance of projects.

5

Director (HR)

Head of Human Resources discipline and exercises control over HR functions.

Human Resources, training and development.

6

Unit Heads

Head of the Units exercise control over the Units.

Admin. of Units

7

Company Secretary

Statutory Post under the Companies Act’ 1956

Corporate Affairs, Project Finance, Audit, Trust management.

The above senior executives are supported by sub-ordinate officers and staff.

.

   MANUAL-3  

Procedure Followed in Decision Making Process

[Section-4 (1) (b) (iii)]

1. What is the procedure followed to take a decision for various matters?(A reference to Secretariat Manual and Rule of Business Manual, and other rules/ regulations etc can be made):

The decision making process in OHPC is very transparent and effective. The proposals emanating from any branch are thoroughly examined by the finance, technical and HR wings as the case may be. The proposals which involve financial involvement are forwarded to the finance wing for financial concurrence. The decisions are taken by the respective Officials according to the delegation of power of the Corporation or by the Board, as the case may be. Policy guidelines which require approval / concurrence of the State Govt. are forwarded to the State Govt. for approval and only after receipt of the Govt. approval, such proposals are implemented / carried out.

 

   MANUAL-4 

Norms for Discharge of Functions

[Section-4 (1) (b) (iv)]

SL.

Activity

Time Frame/Norm

Remarks

1

Generation of Power

As decided by SLDC depending upon Grid requirement

Quantum  of generation mostly depends on rainfall and reservoir level & Irrigation Requirement

2

Maintenance of Hydro Power Stations.

As per the program designed at the beginning of the year

Jointly decided with SLDC

3

Capital works including renovation, modernization and expansion.

As per the work schedule & approval of Honble OERC

Care taken for no time or cost overrun.

4

Procurement of stores and spares

As per the plan drawn up looking in to the inventory level, requirement and the source of availability.

To ensure proper inventory control and management.

5

Other activities which require expenditure of revenue nature.

As per the provision in the budget.

To ensure check and balance over such activities.

6

(1)(i)The monthly Energy & capacity Charge bill of different Power Stations of OHPC is prepared by respective Power station of OHPC.

Monthly

Verification is done by Regulatory & Commercial Cell of Corporate Office. The bills are raised by Corporate Finance to GRIDCO after re-verification

(1) (ii) The monthly Energy Bill of CSPDCL drawl towards its 5MW share from HHEP, Burla as per the monthly report of REA for bilateral transaction of energy of ERPC and considering the interstate transmission loss as approved by OERC, is prepared by Regulatory & Commercial Cell, Corporate Office.

Monthly

The bill is raised to CSPDCL by Corporate finance after verification of the same.

(1) (iii) The monthly Odisha share of O & M Bill of MHEP (Jt.) Scheme is raised by APGENCO as per New Machkund Agreement,2020

Monthly

After verification of the monthly O & M Bill of MHEP(Jt.) Scheme  by Corporate finance, the same is raised to GRIDCO for payment. Energy and cost reconciliation between OHPC, GRIDCO & APGENCO in respect of MHEP (Jt.) Scheme has been done up to FY2015-16.

(2) (i) Filing of Tariff

Annually

Decided through Public hearing by OERC

(2) (ii) Matters relating to regulatory affair

As and when required

Taken up by the Regulatory & Commercial Cell of Corporate office.

(3) Truing up of ARR

Annually

 

SLDC : State Load Despatch Centre.

   MANUAL-5 

Rules, Regulations, Instructions, Manuals & Records for Discharging Functions

[Section-4 (1) (b) (v)]

Sl.

 

Name of the act, rules, regulations etc.

Brief gist of the contents

Reference No

if any

Price in case of priced publications

1

OHPC Officers Service Regulations, 1996

Service Regulations

-

For internal reference / use only.

2

OHPC Officers Service Rules,2000

Service Rules

-

-do-

3

OHPC Non- executives employees Service Rules,2005

Non-executives Service Rules

-

-do-

4

Delegation of Power,1998 Updated up to 2019

Power of the different authorities of OHPC

-

-do-

5

Accounts Manual,2002

Procedure of maintenance and audit of accounts and cost control.

-

-do-

6

Internal Audit Manual,2005

Questionnaire on the effectiveness of

the cost centres.

-

-do-

  MANUAL-6 

Categories of Documents Under Control

[Section-4(1) (b) (vi)]

Sl.

Nature of Record

Details of information available

Unit / Section where available

Retention period, where available

1

Reservoir level

Reservoir level (daily) of dams

Corporate Office

-

2

Monthly generation data

Generation of

Power in the Units

-do-

-

3

Monthly Sale of

power

Sale of Power by the Generating Units of OHPC

Corporate Office/Generating Units of OHPC

-

4

Man in position at Corporate

Office and units

Man in position at the end of each month

-do-

-

5

Copies of contracts :

-

-do-

-

 

(a)

Balimela Extn.

7th and 8th Units.

  With Power Machines, Russia With LMZ energy, (India) Ltd.

-do-

Project Completed

 

(b)

RM&U of Unit 3 & 4, Burla

With M/s. Voith Siemens, Germany,

 With M/s. Siemens, India.

-do-

Project Completed

6

Copies    of Loan agreement with PFC

 UIHEP

RM&U of 3&4, Burla

 Balimela Extension Project.

-do-

 

7

 BHEP Balimela

R&M work of unit - 1, 2, 3 & 4 are completed and the units are under commercial operation

M/S.BHEL   

8

HHEP, Burla

The R&M Works of unit -  5 & 6 completed and the units are under commercial operation

 M/S Voith  

9

CHEP, Chipilima

The R&M Works of unit -  3 completed and the units are under commercial operation

 M/S Voith  

  MANUAL-7 

Particulars of Arrangement in Formulation of Policy

[Section-4 (1) (b) (vii)]

OHPC Ltd. is incorporated under the provisions of Companies Act, 1956. It is a separate legal entity. The Board of Directors of the Corporation is responsible for the Management of the affairs of the Corporation and comprises of Functional Directors, Govt. Nominee Directors of different Departments of Govt. of Odisha and Independent Directors. All the policies of the Corporation are formulated and approved by its Board of Directors from time to time. The said policies of the Corporation are in consonance with the guidelines / directives of the Govt. issued from time to time.

 

 

  MANUAL-8

Boards, Councils, Committees & Other Bodies Constituted

[Section-4 (1) (b) (viii)]

Constitutions of Audit Committee of OHPC:-

 

As per Section of Companies Act, 2013, OHPC is required to constitute an Audit Committee of the Board. The Audit Committee shall consist of a minimum of 03 nos. of Directors with Independent Directors forming a majority. Provided majority of members of Audit Committee including its Chairperson shall be persons with ability to read and understand, the financial statements.

Sl No.

Name of the Member

Position

1.

Sh Debaraj Biswal, Independent Director

 

Chairman

2.

Dr. Satya Priya Rath, IAS

Director (Budget)-cum-Deputy Secretary to Govt. of Odisha, Finance Department,

 

Member

3.

Sh Ramesh Chandra Tripathy, Independent Director

 

Member

4.

Sh Dronadeb Rath, Independent Director

 

Member

5.

Sh Ashish Kumar Mohanty, Director(Operation)

 

Member.

 

Broad scope of work:-

 

The Audit Committee of the Board shall

 

  1. The recommendation for appointment, remuneration and terms of appointment of auditors i.e. Internal Auditor, Cost Auditor and Secretarial Auditor of the Company;
  2. Appointment of Tax Auditor and GST Auditors of the Company.
  3. Recommendation for Appointment of Cost Accounting Firms for Maintenance of Cost Records of the Company.
  4. Examination of the financial statement and the Statutory Auditors’ report thereon;
  5. Review of the draft replies of the Management on the Comments of the C&AG and the report of the Statutory Auditors on the Standalone and Consolidated Financial Statement of the Company.
  6. Review and monitor the auditor’s independence and performance, and effectiveness of audit process;
  7. Scrutiny of inter-corporate loans and investments;
  8. Evaluation of internal financial controls and risk management systems;

 

 

Constitution of Audit Committee of OHPC:

Sl

Name of the Member

Position

1

Sh Debaraj Biswal, Independent Director

Chairman

2

Sh. R.C. Tripathy, Independent Director

Member

3

Sh Dronadeb Rath, Independent Director

Member

4

Dr. Satya Priya Rath, Director,

Addl. Secy, Finance Dept. Govt. of Odisha

Member

Broad scope of work:

The Audit Committee of the Board shall

  1. The recommendation for appointment, remuneration and terms of appointment of auditors i.e. Internal Auditor, Cost Auditor and Secretarial Auditor of the company;
  2. Appointment of Tax Auditor and GST Auditors of the Company.
  3. Recommendation for Appointment of Cost Accounting Firms for Maintenance of Cost Records of the Company.
  4. Examination of the financial statement and the Statutory auditors’ report thereon;
  5. Review of the draft replies of the Management on the Comments of the C & AG and the report of the Statutory Auditors on the Standalone and Consolidated Financial Statement of the Company.
  6. Review and monitor the auditor’s independence and performance, and effectiveness of audit process;
  7. Scrutiny of inter-corporate loans and investments;
  8. Evaluation of internal financial controls and risk management systems;

 

 

  MANUAL-9
Directory of Officers & Employees
[Section-4 (1) (b) (ix)]

Sl.No.

Name

Designation

Contact

E-Mail

Address

1

Sri Saswat Mishra,IAS

Chairman-Cum-MD

2541315

ohpc.co@gmail.com

OHPC,Bhoi Nagar ,BBSR 

2

 Vacant

Managing Director

2542862

md.ohpc@ohpcltd.com

 

3

Ashish Kumar Mohanty

Director (Operation)

2542834

do@ohpcltd.com

 

4

Pranab Kumar Mohanty

Director (Finance)

2541426

df@ohpcltd.com

 

5

Anima Tripathy

SGM (HR)

2541223

dh@ohpcltd.com

 

6

Debalok Mohanty

CGM (Fin)

2541536

ohpc.co@gmail.com

 

7

Amiya Kumar Mohanty

SGM (Electrical)

 

ohpc.co@gmail.com

 

8

Biranchi Narayan Mallick

SGM (Electrical)

2743165

ohpc.co@gmail.com

 

9

Gagan Bihari Moharana

SGM (Fin)

2540423

ohpc.co@gmail.com

 

10

Nilakantha Srichandan

SGM (Civil)

 

ohpc.co@gmail.com

 

11

Basudev Sahoo

GM (HR)

 

ohpc.co@gmail.com

 

12

Binyamin Limma

DGM (El.)

 

ohpc.co@gmail.com

 

13

Jafran Kumar Mohapatra

GM (I&C)

 

ohpc.co@gmail.com

 

14

Pradeep Mohan Rout

GM (Fin)

 

ohpc.co@gmail.com

 

15

Pradeepta Mohan Singh

GM (IT)

 

ohpc.co@gmail.com

 

16

Sangram Keshari Das

GM (Electrical)

 

ohpc.co@gmail.com

 

17

Arjun Kumar Sahu

DGM (El.)

 

ohpc.co@gmail.com

 

18

Chittaranjan Behera

DGM (El.)

 

ohpc.co@gmail.com

 

19

Jogesh Chandra Sahu

DGM (El.)

 

ohpc.co@gmail.com

 

20

Niranjan Jena

DGM (Finance)

 

ohpc.co@gmail.com

 

21

Prasant Patra

DGM (El.)

 

ohpc.co@gmail.com

 

22

Samir Mohapatra

DGM (El.)

 

ohpc.co@gmail.com

 

23

Subrat Kumar Senapati

DGM (El.)

 

ohpc.co@gmail.com

 

24

Surajit Paul

DGM (El.)

2743166

ohpc.co@gmail.com

 

25

Akshay Kumar Das

AGM (El.)

 

ohpc.co@gmail.com

 

Sl.No.

Name

Designation

Contact

E-Mail

Address

26

Bhagyalaxmi Dash

AGM (El.)

-

ohpc.co@gmail.com

Odisha Hydro Power Corporation Limited, Bhubaneswar

27

Debasis Behera

AGM (HR)

 

ohpc.co@gmail.com

 

28

Kamlesh Swain

AGM (HR)

 

ohpc.co@gmail.com

 

29

Malay Kanta Swain

AGM (El.)

 

ohpc.co@gmail.com

 

30

Manoj Kumar Mohanty

AGM (HR)

 

ohpc.co@gmail.com

 

31

Rajesh Kumar Sahoo

AGM (El.)

 

ohpc.co@gmail.com

 

32

Susil Kumar Khuntia

AGM (El.)

 

ohpc.co@gmail.com

 

33

Bijayalaxmi Behera

Manager (Fin)

 

ohpc.co@gmail.com

 

34

Dipika Choudhury

Manager (Fin)

 

ohpc.co@gmail.com

 

35

Gouranga Charan Sahoo

Manager (Legal)

 

ohpc.co@gmail.com

 

36

Jitendra Kumar Nayak

Manager (El.)

 

ohpc.co@gmail.com

 

37

Kabiranjan Sethi

Mananger (El.)

 

ohpc.co@gmail.com

 

38

Loknath Mohanty

Manager (Fin)

 

ohpc.co@gmail.com

 

39

Sandhyarani Mahapatra

Manager (El.)

 

ohpc.co@gmail.com

 

40

Sangita Kumari Senapati

Manager (El.)

 

ohpc.co@gmail.com

 

41

Sanjay Kumar Biswal

Manager (IT)

 

ohpc.co@gmail.com

 

42

Sarat Chandra Soren

Manager (El.)

 

ohpc.co@gmail.com

 

43

Smruti Sudha Panda

Manager (PR)

 

ohpc.co@gmail.com

 

44

Aliva Mohanty

DM (Fin)

 

ohpc.co@gmail.com

 

45

Diptirekha Sahoo

Dm (Fin)

 

ohpc.co@gmail.com

 

46

Gouri Shankar Dash

DM (IT)

 

ohpc.co@gmail.com

 

47

Jyotirmaya Panigrahi

DM (Sect.)

 

ohpc.co@gmail.com

 

48

Kailash Chandra Nayak

DM (El.)

 

ohpc.co@gmail.com

 

49

Madhumita Meher

DM (El.)

 

ohpc.co@gmail.com

 

50

Priyanka Bardhan

DM (HR)

 

ohpc.co@gmail.com

 

 

Sl.No.

Name

Designation

Contact

E-Mail

Address

51

Sarat Kumar Behera

DM (HR)

 

ohpc.co@gmail.com

 

52

Sashibhusan Nayak

DM (IT)

 

ohpc.co@gmail.com

 

53

Shraban Kumar Behera

DM (Civil)

 

ohpc.co@gmail.com

 

54

Snehasis Pattanaik

DM (HR)

 

ohpc.co@gmail.com

 

55

Srabani Nanda

DM (Ex-Cadre)

 

ohpc.co@gmail.com

 

56

Subhasis Dash

DM (Electrical)

 

ohpc.co@gmail.com

 

57

Suraj Kumar Sahoo

DM (Fin.)

 

ohpc.co@gmail.com

 

58

Sushree Chandan Panda

DM (El.)

 

ohpc.co@gmail.com

 

59

Suvendu Kumar Biswal

DM (IT)

 

ohpc.co@gmail.com

 

60

Tarini Sankar Swain

DM (El.)

 

ohpc.co@gmail.com

 

61

Anasuya Dash

SO (STS)

 

ohpc.co@gmail.com

 

62

Arjun Swain

OSD to CMD

 

ohpc.co@gmail.com

 

63

Bijaya Kumar Maharana

Sr. SP

 

ohpc.co@gmail.com

 

64

Biswanath Behera

SO (SG)

 

ohpc.co@gmail.com

 

65

Dillip Chandra Das

SO (SG)

 

ohpc.co@gmail.com

 

66

Kabita Khatua

Sr. PS

 

ohpc.co@gmail.com

 

67

Rabindra Nath Das

SO (SG)

 

ohpc.co@gmail.com

 

68

Rabindra Nath Sahu

SO (SG)

 

ohpc.co@gmail.com

 

69

Aradhana Pradhan

AM (El.)

 

ohpc.co@gmail.com

 

70

Biswajit Mohanty

AM (Env.)

 

ohpc.co@gmail.com

 

71

D Roshni Patro

AM (Fin)

 

ohpc.co@gmail.com

 

72

Govinda Chandra Singh

AM (Civil)

 

ohpc.co@gmail.com

 

73

Ipsita Sahoo

AM (IT)

 

ohpc.co@gmail.com

 

74

Jyotiprakash Tarei

AM (Civil)

 

ohpc.co@gmail.com

 

75

Omkar Amrutanshu

AM (IT)

 

ohpc.co@gmail.com

 

 

Sl.No.

Name

Designation

Contact

E-Mail

Address

76

Priti Manjari Naik

AM (El.)

 

ohpc.co@gmail.com

 

77

Rakesh Kumar Dash

AM (PR)

 

ohpc.co@gmail.com

 

78

Shankar Sethy

AM (El.)

 

ohpc.co@gmail.com

 

79

Shatabdi Beura

AM (IT)

 

ohpc.co@gmail.com

 

80

Sudam Keshasri Swain

AM (El.)

 

ohpc.co@gmail.com

 

81

Lokanath Nayak

JM (El.)

 

ohpc.co@gmail.com

 

82

Gopinath Tanti

MT (FIN)

 

ohpc.co@gmail.com

 

83

Rashmi Parida

MT (Fin.)

 

ohpc.co@gmail.com

 

  MANUAL -10 

Monthly Remuneration & Compensation of Officers & Employees

[Section-4 (1) (b) (x)]

Sl.No.

Name

Designation

Basic Pay

Monthly Remuneration (In.Rs.)

1

Vacant

Managing Director

 

 

2

Ashish Kumar Mohanty

Director (Operation)

192600

337900

3

Pranab Kumar Mohanty

Director (Finance)

181600

318650

4

Vacant

CGM (HR)

 

 

5

Debalok Mohanty

CGM (Finance)

147700

259650

6

Anima Tripathy

SGM (HR)

126455

222147

7

Vacant

SGM (Elect.)

 

 

8

Gagan Bihari Maharana

SGM (Finance)

134800

236750

9

Vacant

Sr. GM (Elect.)

 

 

10

Biranchi Narahan Mallick

GM (Elect.)

126800

222750

11

Basudeb Sahoo

GM (HR)

123100

216550

12

Jafran Kumar Mohapatra

GM (Instru & Control)

130600

229400

13

Nilakantha Srichandan

GM (Civil)

130600

203280

14

Pradeepta Mohan Singh

GM (IT)

126800

223460

15

Amiya Kumar Mohanty

GM (Elect.)

134800

236750

16

Vacant

GM (Elect.)

 

 

17

Sangram Keshari Das

DGM (Elect.)

115800

206000

18

Niranjan Jena

DGM (Finance)

91400

162250

19

Arjun Kumar Sahu

DGM (Elect.)

112400

200050

20

Surjit Paul

DGM (Elect.)

112400

200050

21

Binyamin Limma

DGM (Elect.)

112400

200050

22

Subrat Kumar Senapati

AGM (Elect.)

108800

191250

23

Rajesh Kumar Sahoo

AGM (Elect.)

105600

188150

24

Malaya Kanta Swain

AGM (Elect.)

105600

185650

25

Manoj Kumar Mohanty

AGM (HR)

67700

119225

Sl.No.

Name

Designation

Basic Pay

Monthly Remuneration (In.Rs.)

26

Bhagyalaxmi Dash

AGM (Elect.)

102500

182725

27

Akshaya Kumar Das

AGM (Elect.)

108800

194490

28

Debasis Behera

AGM (HR)

91100

142055

29

Sushil Kumar Khuntia

AGM (Elect.)

102500

182725

30

Vacant

AGM (Elect.)

 

 

31

Prasanta Patra

AGM (Elect.)

112100

199800

32

Samir Mohapatra

AGM (Elect.)

112100

199525

33

Kamlesh Swain

AGM (HR)

88400

158050

34

Sanjay Kumar Biswal

Manager (IT)

78500

140675

35

Smrutisudha Panda

Manager (PR)

78500

140675

36

Gouranga Charan Sahoo

Manager (Legal)

76200

121410

37

vacant

Manager (HR)

 

 

38

Kabiranjan Sethi

Manager (Elect.)

99500

178045

39

Jitendra Kumar Nayak

DM (Elect.)

90000

160800

40

Suvendu Kumar Biswal

DM (IT)

75400

135250

41

Sangita Kumari Senapati

Dy. Manager (Elect.)

78500

140675

42

Dipika Choudhury

Dy. Manager (Finance)

73200

129900

43

Lokanath Mohanty

Dy. Manager (Finance)

73200

131400

44

Srabani Nanda

Dy. Manager

65000

115350

45

Subasish Dash

Dy. Manager (Elect.)

75400

133750

46

Sandhyarani Mohapatra

Dy. Manager (Elect.)

75400

135250

47

Tarini Sankar Swain

Dy. Manager (Elect.)

75400

135250

48

Sashi Bhusan Nayak

Dy. Manager (IT)

73200

129900

49

Priyanka Bardhan

Dy. Manager (HR)

73200

129900

50

Madhumita Meher

Dy. Manager (Elect.)

69000

124000

Sl.No.

Name

Designation

Basic Pay

Monthly Remuneration (In.Rs.)

51

Sushree Chandan Panda

Dy. Manager (Elect.)

56100

101475

52

Barata Ganesh

Asst. MGR (Elect.)

90000

145700

53

Gouri Sankar Dash

Asst. Manager (IT)

63100

99555

54

Omkar Amrutanshu

Asst. Manager (IT)

63100

112175

55

Aliva Mohanty

Asst. Manager (Finance)

63100

112175

56

Anurag Mohanty

Asst. Manager (Legal)

29447

51882

57

Biswajit Mohanty

Asst. Manager (ENV)

63100

112175

58

Suraj Kumar Sahoo

Asst. Manager (Finance)

63100

112175

59

Diptirekha Sahoo

Asst. Manager (Finance)

63100

112175

60

Shraban Kumar Behera

Asst. Manager (Civil)

63100

99555

61

Shankar Sethy

Asst. Manager (Elect.)

63100

112175

62

Shatabdi Beura

Asst. Manager (IT)

63100

112175

63

Snehasis Pattanaik

Asst. Manager (HR)

63100

99555

64

Jyotirmaya Panigrahi

Asst. Manager (SECRTL)

63100

111975

65

Pritimanjari Naik

Asst. Manager (Elect.)

59500

105675

66

Jyoti Prakash Tarei

Asst. Manager (Civil)

56100

88505

67

Govind Ch. Singh

Asst. Manager (Civil)

56100

87705

68

Ipsita Sahoo

Asst. Manager (IT)

56100

99725

69

Sudam Keshari Swain

Asst. Manager (Elect.)

59500

105875

70

Lokanath Nayak

Jr. Manager (Ele)

50500

89975

71

Bijaya Kumar Maharana

Sr. PS

80000

125840

72

Kabita Khatua

Sr. PS

77700

137815

73

Dillip Chandra Das

Section Officer (SG)

65000

102800

74

Anasuya Dash

SO (STS)

77700

139601

75

Biswanath Behera

Section Officer (SG)

63100

112175

Sl.No.

Name

Designation

Basic Pay

Monthly Remuneration (In.Rs.)

76

Rabindra Nath Das

Section Officer

65000

115500

77

Rabindra Nath Sahu

SO (SG)

77700

137725

78

Sarat Kumar Behera

Dy. Manager (Elect)

56100

99975

79

Chittaranjan Behera

DGM (Elect.)

78800

138750

80

Kailash Chandra Nayak

Dy. Manager (Elect.)

56100

98975

81

Bijaya Laxmi Behera

Dy. Manager (Finance)

56100

98975

82

Pradeep Mohan Rout

GM (Finance)

126800

222750

83

Rakesh Kumar Dash

Asst. Manager (PR)

56100

99925

84

Jogesh Chandra Sahu

DGM (Elect.)

109100

191775

85

D Rosni Patra

MT Finance

 

50200

86

Gopinath Tanti

MT Finance

 

50200

Total

7646602

13440005

87

Vacant

Superintt (D&D)

 

 

88

Vacant

Driver – A

 

 

89

Dusasan Naik

Dairy-cumDespatcher

42200

67035

90

Susanta Maharana

Driver – B

33400

53395

91

Laxman Dash

Driver – A

51100

91160

92

Gangadhar Behera

Zamadar

42200

75346

93

Sudhir Kumar Mohapatra

Bank Attendant

42200

66760

94

Sweta Kumar Tripathy

Sr. Assistant

60400

108000

95

Dillip Kumar Nayak

Sr. Draftsman

62200

110450

96

Harekrushna Dash

Comp. Asst. Gr – III

51900

81920

97

Vacant

Comp. Asst. Gr – III

 

 

98

Manoranjan Kunar

Peon

22400

40550

99

Sk. Sikandar Ali

Jr. Artisan – A

36400

65050

100

Priyabrata Nayak

Trainer (HPO)

36400

65175

Sl.No.

Name

Designation

Basic Pay

Monthly Remuneration (In.Rs.)

101

Purna Chandra Nayak

Trainer (HPO)

34900

62550

102

Muktipada Mallick

Trainer (Elect.)

38700

69325

103

Tikan Chandra Bilash

Trainer (Elect.)

56900

101375

104

Vacant

Trainer (Mechl)

 

 

105

Santosh Kumar Panigrahy

Trainer (Mechl)

38700

69325

106

Satyajit Dash

Elect. Trainee

22700

22900

107

Chandan Mohapatra

Wireman Trainee

22700

22900

108

Jogamaya Rout

Store Keeper Trainee

22700

22900

106

KM Chandram

CSVO

80000

80000

107

PN Seth

Advisor

80000

80000

  MANUAL-11 

Budget Allocated to each Agency

[Section-(4) (1) (b) (xi)]

OCPL- EQUITY RECEIVED FROM DoE, GoO
Sl No Particulars Voucher No. Date Amount
1 Received from GoO towards issue of Share Capital for investment in OCPL BR (SBI)-195 23.02.2017 300000000
2 Received from GoO towards issue of Share Capital for investment in OCPL BR (SBI)-48 21.10.2017 190000000
3 Received from GoO towards issue of Share Capital for investment in OCPL BR (SBI)-96 24.12.2018 490000000
4 Received from GoO towards issue of Share Capital for investment in OCPL BR (SBI)-41 28.02.2020 490000000
5 Received from GoO towards issue of Share Capital for investment in OCPL BR (SBI)-20 23.12.2020 225400000
  Total     1695400000

 

  MANUAL-12 

Manner of Execution of Subsidy Programmes

[Section-4 (1) (b) (xii)]

 

 

  MANUAL-13 

Particulars of Recipients of Concessions, Permits or Authorizations Granted

[Section-4 (1) (b) (xiii)]

 

  MANUAL-14 

Information Available in an Electronic Form

[Section-4 (1) (b) (xiv)]

Sl.

Activities for which electronic data available

Nature of information available

Can it be shared with public

Is it available on website or is being used as backend database?

1

2

3

4

5

1

Activities of OHPC

Objectives, mission etc.

Yes

Yes

2

Board of Directors

Constitution of Board

Yes

Yes

3

Audited balance sheet

Assets & Liabilities position

Yes

Yes

4

Audited Profit & loss account

Profitability position

Yes

Yes

5

Daily reservoir level

Water level in Dam

Yes

Yes

6

Monthly power generation

Generation of Power

Yes

Yes

7

Monthly sale of power

Sale of power

Yes

Yes

8

Man in position at the end of each month

Man Power

Yes

NO

  MANUAL-15 

Particulars of Facilities Available to Citizens for Obtaining Information

[Section-4 (1) (b) (xv)]

Sl.

Facility available

Nature of Information available

Working hours

1

2

3

4

1

Information Counter

To receive application from public

10 AM to 5.30 PM

2

Website

All information as contained in manual 14

10 A M to 5.30 P M

3

Library

For use of OHPC Officers & Staffs

-do-

4

Notice board

Current circulars/ office orders

-do-

  MANUAL-16 

Names, Designations & Other Particulars of the Public Information Officers

[Section-4 (1) (b) (xvi)]

Public information Officer (PIO):

Sl.

Name

Designation

Office Ph. No.

Fax

E-mail

Address

Bank Account Details

1

2

3

4

5

6

7

8

1

Sri Kamlesh Swain

AGM (HR)

7328840436

0674-2542012

kamlesh_ohpc@yahoo.com

Corporate Office, Vanivihar Chhak, Janpath, Bhoinagar, Bhubaneswar,
PIN- 751022

Union Bank of India, Saheednagar Branch, BBSR

A/c No.725802010002530

IFSC Code-UBIN0572586

 Assistant Public Information Officers (APIOs):

Sl.

Name

Designation

Office Ph. No.

Fax

E-mail

Address

1

2

3

4

6

7

8

1

Bhagyalaxmi Dash

AGM(El)& APIO(Tech)

7328840030

 -

 ohpc.co@gmail.com

Corporate Office, Vanivihar Chhak, Janpath, Bhoinagar, Bhubaneswar,
PIN- 751022

2

Srima Behura

AM(HR)& APIO (HR)

7328841860

ohpc.co@gmail.com 

-do-

3

Dipika Choudhury

DM (Finance) & APIO (Finance)

7328840057

ohpc.co@gmail.com 

-do-`

First Appellate Authority (FAA):

Sl. No.

Name

Designation

Office Ph. No.

Fax

E-mail

Address

1

2

3

4

6

7

8

1

Anima Tripathy

CGM (HR) 0674-2541223

 -

dh@ohpcltd.com

Corporate Office, Vanivihar Chhak, Janpath, Bhoinagar, Bhubaneswar,
PIN- 751022

  MANUAL-17 

Other Useful Information

[Section-4 (1) (b) (xvii)]

Sl No

Name of PSU

IR No/Year

Para No

IIA

Para No

IIB

Subject

Complied

(Yes/No) 

Received from (CAG /PAC)

Attachment

1

ODISHA HYDRO

POWER CORPORATION LTD. (OHPC LTD.)- Balimela Unit (BHEP)

114/2008

3

 

Undue favor to contractor and loss ofRs.6.99 Crore.

 

 

 

2

94/2009-10

 

4

Doubtful recovery of the cost of training at Russia.

 

 

 

3

 

5

Non-persuasion of insurance claim of Rs.42.61 lakh.

 

 

 

4

 

8

Outstanding advance  against the suppliers Rs.12.14 .lakh.

 

 

 

5

 

9

Un-authorised occupation of quarters-loss of Rs. 29.42 lakh.

 

 

 

6

113/2010-1

 

10

Non-conducting of Physical verification of Diesel Bunk.

 

 

 

7

145/2012-13

 

2

Avoidable payment of interest on custom duty-Rs.16.82 lakh.

 

 

 

8

 

 

 

Loss ofRs.1.99 crore towards capacity charge due to absence of maintenance spares for Unit-IV.

 

 

 

9

 

 

4

Irregular payment of Excise Duty-Rs.14.70 lakh.

 

 

 

10

 

 

3

Non-obtaining of utilization certificate for Rs.133 lakh (Peripheral Development) and release of Rs.3 lakh annually to educational institutions as Grants-in-Aid.

 

 

 

11

 

 

5

Non-recovery of HR &EC from non-OHPC allottees of BHEP Quarters­Rs.19.63 lakh.

 

 

 

12

 

 

6

Non-settlement of insurance claim ofRs.70.49 lakh.

 

 

 

13

 

 

 

loss of capacity charges of Rs.12. 1O crores for non-adherence to recommendations of OEM and norms of OERC.

 

 

 

14

 

 

3

Delay in finalization of tender for Renovation & Modernization of Unit 1 to 6 resulted in loss of Capacity charge ofRs.9.89 Crore for forced shut down of Unit-I.

 

 

 

15

 

 

4

Excess recovery of Capacity charges ofRs.8.45 crore from Grideo declaring renovation and Modernization ofUnit-1 prior to handing over for R&M.

 

 

 

16

9/2012-13

 

5

Loss of Capacity charges ofRs.29 lakh and Generation Loss ofRs.70.55 lakh for delay in handing over of Operating Machine for R&M.

 

 

 

17

132/2017-18

 

9

In fructuous expenditure of Rs.19 .65 lakh towards consultancy work for construction of water treatment plant.

 

 

 

 

18

 

 

10

Non -payment of electricity duty of Rs.81.21 lakh.

 

 

 

19

 

 

11

Irregularities on allotment of quarters and non-recovery of outstanding dues from non-OHPC employees.

 

 

 

20

 

 

12

Non-obtaining of utilization certificate of funds released for Peripheral Development.

 

 

 

21

 

 

13

Non-adjustment/non-recovery of Advance and rent Rs.2.07 lakh.

Yes

CAG

Attachment was forwarded along with the Original Reply

 

 

 

Sl No

IR No/Year

Para No

IIA

Para No

IIB

Subject

Complied

(Yes/No) 

Received from (CAG /PAC)

Attachment

22

 

 

14

Non Credit of Rs.44,500/-To Bank Account.

 

 

 

23

88/2018-19

 

2

Under recovery due to non revision of Electricity Charges to be recovered from the occupants of the quarter.

 

 

 

24

 

3

Extra burden of Rs.40.84 Lakh (Aprox) towards ED due to higher Transformation loss/auxiliary consumption.

 

 

 

25

 

4

Non conversion of electricity charges from DoWR and other Private Consumers Rs.100.41 Lakh

 

 

 

26

 

5

Non Conversion of Current Account to Flexi Account led to loss of interest Rs.2.06 lakh.

 

 

 

27

 

6

Non implementation of Biometric attendance system at BHEP, Balimela.

 

 

 

28

 

 

7

Excess transformation loss over the norm and loss of Revenue of Rs.82.16 lakh.

 

 

 

29

79/2021-22

 

2

Excess  transformation loss over the norm and loss of revenue of Rs.1.11 Crore

 

 

 

30

 

3

Extra burden ofRs.1.47 Crore towards ED due to higher transformation loss/auxiliary consumption.

 

 

 

31

 

4

Non-materialization of RoR  of the land in the name of the company,

 

 

 

32

 

5

Irregularity and delay in execution of “Design, supply,,installation,te sting& commissioning of Bus-Bar Protection Relay (LBB) under PSDF Scheme.

 

 

 

33

 

6

Huge stock of obsolete/slow moving/ non-moving stocks in the preservation store lead to blockage of fund coupled with blockage of storage space.

 

 

 

34

 

7

Non  revoke of suspension beyond 180 days.

 

 

 

35

 

8

Irregulation in operation performance of departmental vehicles.

 

 

 

36

 

9

Non realization ofRs.44,500/- from SBI,Orkel Branch.

 

 

 

Sl No

Name of PSU

IR No/Year

Para No

IIA

Para No

IIB

Subject

Complied

(Yes/No) 

Received from (CAG /PAC)

Attachment

1

ODISHA HYDRO

POWER CORPORATION LTD. (OHPC LTD.)- Balimela Unit (BHEP)

106/2010-11

2

 

Loss of Rs.21Lakh due to non recovery of capacity charge.

yes

CAG

 

2

108/2012-13

 

7

Outstanding advances against suppliers-Rs.26.69lakh

 

3

 

 

2

Improper planning & lack of coordination led to inordinate delay in completion

of R&M work ,the Unit-3 resulted in loss of capacity charges of Rs.3.19 crore.

Attachment was forwarded along with the Original Reply

4

134/2017-18

 

3

Excess Transformation loss over the norm led to revenue loss of Rs.20.38

 

5

 

 

4

Extra burden of Rs. 12.77 lakhs towards ED due to higher tran????fom1ation loss.

 

6

 

 

5

Avoidable expenditure of Rs. 1.58 lakh towards SIR to Roof Treatment off & TG type residential quarters of OHPC colony, CHEP, Chiplima.

 

7

 

 

6

Non-adjustment of Advances.

 

Sl No

Name of PSU

IR No/Year

Para No

IIA

Para No

IIB

Subject

Complied

(Yes/No) 

Received from (CAG /PAC)

Attachment

1

 

281/2004-05

 

2

Extra  expenditure of Rs. 80.00 Lakh due to procurement of Governor Item for Unit-II.

 

 

 

2

 

76/2008-08

 

4

Undue favour to contractor because of allowing extension of time without imposition of L.D t 6  lakh and consequential agreed EOT claim of M/s Voith Siemens - t 49.22 lakh

 

 

 

3

 

136/2008-09

3

 

Erroneous computation of ARR resulted in loss of revenue 571 lakh.

 

 

 

4

 

135/2009-10

2

 

Loss of _generation due to delay in repair  of stator core  3.26 crore.

 

 

 

5

 

102/2010-11

3

 

Avoidable expenditure of Rs. 22.38 lakh.

 

 

 

6

 

95/2011-12

 

4

Improper  inventory management in respect of special concrete cement - Rs.31.54 lakh.

 

 

 

7

 

 

3

 

Avoidable loss of 4.78 crore towards sharing of transmission loss but not claiming wheeling charges against the Burla-Chiplima Tie I and Tie II lines.

 

 

 

8

 

95/2011-12

4

 

Non-recovery of Capacity Charges due to not reducing the Installed Capacity of Units under maintenance.

 

 

 

9

 

 

 

6

Avoidable extra expenditure  of Rs 27.78 lakh due to delay in placement of work order for grouting works.

 

 

 

10

 

 

2

 

Loss ofRs 3.98 crore towards capacity charges due to non-awarding of work to OEM

 

 

 

11

 

 

 

4

Irregular payment of excise duty of Rs.14.15 lakhs

 

 

 

12

 

127/2012-13

 

6

Loss of  generating and Grid disturbance due to injection/drawal of power by HINDALCOD

 

 

 

13

 

 

 

7

Deficiencies in inventory management

 

 

 

14

 

 

 

8

Excess transformation losses.

 

 

 

15

 

 

 

2

Delay in taking up of repair and  maintenance work of unit No.6

 

 

 

16

 

115/2013-14

 

4

Delay in certification of energy bill leading to excess payment of tax.

 

 

 

17

 

 

 

5

Unadjusted of advances.

 

 

 

18

 

 

 

6

Non-recovery of rent outstanding.

 

 

 

19

 

 

2

 

Undue delay in repair of unit -1 leading to loss of Rs.14.98 Crore

 

 

 

20

 

 

3

 

Loss of Rs. 70.95 lakh due to none  claiming of extra expenditure incurred on Unit-5 & 6 as per orders of OERC.

 

 

 

21

ODISHA HYDRO

POWER CORPORATION LTD. (OHPC LTD.)-Burla Unit (HHEP)

 

 

4

Loss due to delay  in taking up of repair and maintenance work of Unit No. 6 ; Rs. 366.79 Lakh.

Yes

CAG

Attachment was forwarded along with the Original Reply

22

 

117/2014-15

 

5

Loss of in Rs.  25.29 lakh to towards excess consumption of turbine oil due to delay in rectification Work.

 

 

 

23

 

 

 

6

Imprudent decision in reimbursement of Dam Maintenance cost to Do WR.

 

 

 

Sl No

Name of PSU

IR No/Year

Para No

IIA

Para No

IIB

Subject

Complied

(Yes/No) 

Received from (CAG /PAC)

Attachment

24

 

 

 

7

Additional expenditure Rs. 14.93 lakh due to injudicious decision to repair 7.5 MVA power transformer

 

 

 

25

 

133/2017-18

2

 

Loss of revenue Rs. 3.64 crore and extra burden on consumers Rs. 10.66 crore due to capital maintenance of Unit-2 during monsoon season.

 

 

 

26

 

 

3

 

Loss of Capacity Charges of 4.4 7 crore and energy charges of 1.4 7 crore for belated action to replace of Generator Transformer.

 

 

 

27

 

 

 

4

Loss of Energy charges of Rs. 6.91 crore due to standby hours of machines despite spillage of water from reservoir.

 

 

 

28

 

 

 

5

Non-adjustment of advance $1.12 crore

 

 

 

29

 

 

 

2

Excess provision of dam maintenance charges-Rs 0.19 crore for 2019-20.

 

 

 

30

 

 

 

3

Loos due to excess auxiliary consumption

 

 

 

31

 

 

 

4

Non disposal of obsolete store material

 

 

 

32

 

78/2021-22

 

5

Irregularity in submission of Final/Adjustment Bill leading to financial loss of interest of 68895/- on advances sanctioned.

 

 

 

33

 

 

 

6

Payment of Inspection fees of Rs.24.31 lakhs without Inspection.

 

 

 

34

 

 

2

 

Forced outage of Unit No. 7 resulted in loss of Capacity Charges - Rs. 8.47 crore

 

 

 

35

 

 

 

3

Accumulation of huge obsolete Stock amounting to Rs. 1.24 Crore ..

 

 

 

36

 

 

 

4

Excess transformation loss in the HHEP power generating stations than the norm fixed by OERC resulted in loss of revenue 0.40 crore.

 

 

 

37

 

 

 

5

Non recovery of Penal rent against rented quarters allotted to Employee/ Ex- employees leads to financial loss of Rs. 0.36 crore.

 

 

 

38

 

115/2022-23

 

6

Non recovery of advance amount from Mis. BHEL for supply of defective/broken materials.

 

 

 

39

 

 

 

7

Delay in completion of work undertaken on PSDF Grant

 

 

 

40

 

 

 

8

Unauthorized occupation of Residential and non-residential quarters of HHEP, Burla.

 

 

 

Sl No

Name of PSU

IR No/Year

Para No

IIA

Para No

IIB

Subject

Complied

(Yes/No) 

Received from (CAG /PAC)

Attachment

1

 

186/2005-06

 

8

Theft/shortage of stores and spares -.Rs.5.54 lakh.

 

 

 

2

 

7212008_09

 

17

Non-enforcement of Performance Guarantee Clause

 

 

 

3

 

 

 

21

Non-Recove_!2' of hire charges-Rs.2.51 lacs

 

 

 

4

 

 

 

4

Non accounted energy drawn for colony consumption - loss of revenue ofRs.3.55 crore.

 

 

 

5

 

114/2009-10

 

5

Non realization of energy charges - Rs. 8.98 crore.

 

 

 

6

 

 

 

6

Operational problem of unit-2 - Leakage of oil of 149000 Ltrs. Loss of Rs.1.25 crore.

 

 

 

7

 

 

 

8

Non Recovery of Electricity duty on auxiliary consumption.

 

 

 

8

 

 

 

10

Outstanding advance to the suppliers.

 

 

 

9

 

 

 

11

Budgeted Expenditure vis-a-vis Actuals.

 

 

 

10

 

 

 

15

Outstanding medical advances against staff.

 

 

 

11

 

 

2

 

Loss of additional revenue ofRs.2.33 crores due to belated decision in procurement of required materials for R&M of Unit-I

 

 

 

12

 

128/2012-13

 

4

Outstanding Medical advance and Temporary advance.

 

 

 

13

 

 

2

 

Non-revision of PAFM leading to loss of Rs 1.98 crore towards capacity charge.

 

 

 

14

 

 

 

4

Loss of36.06 lakh on consumption of turbine Oil due to delay in rectification work:-

 

 

 

15

 

 

 

6

Non accountal of energy drawn for colony consumption-Loss ofrevenue of Rs.2.98 crore.

 

 

 

16

 

 

 

7

 

Less recovery of energy charges due to problem in metering Rs.1. 77 crore

 

 

 

17

 

 

 

2

Excess Transformation loss over the norm led to revenue loss of Rs.1.26 crore

 

 

 

18

 

 

 

3

Extra burden of Rs.88.12 lakh towards ED due to higher transformation loss.

 

 

 

19

 

I 04/2014-15

 

4

Delay in finalizing transport contract led to delay in execution ofUnit-2 work and blockage offund of Rs. 33.56 lakh.

 

 

 

20

 

ODISHA HYDRO POWER CORPORATION LTD. (OHPC LTD.)- Rengali Unit (RHEP)

 

5

Improper planning to replace the DA VR panel after purchase of the same led to blockage of fund ofRs.94.38 lakh.

 

 

Attachment was forwarded along with the Original Reply

21

 

 

 

6

Non-conversion of current account to flexi account led to loss of interest Rs.5.34 lakh.

yes

CAG

 

22

 

 

 

 

 

 

 

 

23

 

129/2017-18

 

7

Non adjustment of the advances.

 

 

 

24

 

 

 

2

Loss of revenue due excess transformer loss more than the OERC prescribed norm

 

 

 

Sl No

Name of PSU

IR No/Year

Para No

IIA

Para No

IIB

Subject

Complied

(Yes/No) 

Received from (CAG /PAC)

Attachment

25

 

24/2022-23

 

3

 

 

 

 

26

 

 

 

4

Non-handing over of quarters of water resources department has resulted in, extra burden of Rs. 1.25 crore despite having own quarters.

 

 

 

27

 

 

 

5

Non-award of contract to L 1 bidder leads to additional expenditure of Rs2,41,800/-

 

 

 

 

 

 

 

 

Delay in condemnation of old or unserviceable departmental vehicles of RHEP, Rengali.

 

 

 

Sl No

Name of PSU

IR No/Year

Para No

IIA

Para No

IIB

Subject

Complied

(Yes/No) 

Received from (CAG /PAC)

Attachment

1

 

 

3

 

Loss due to Payment of Premium on Gross Value of Assets.

 

 

 

2

 

132/2008-09

 

6

Locking up of funds on idle cables/conductors Rs.1.97 crore - Consequential loss of interest thereon - Rs.1.31 crore.

 

 

 

3

 

1212012-13

 

14

Delay in execution of work order on construction of new re????ovation. 9f

existing drainage, sew coverage system of P.H Colony, Mukhiguda

 

 

 

4

 

 

 

2

N on-recovery of electricity charges leading to blockage of funds: 76.04 Lakh.

 

 

 

5

 

 

 

3

Avoidable payment of Rs. 3.65 Lakh due to delay in payment of energy Bill.

 

 

 

6

 

157/2012-13

 

4

Outstanding advance of Rs. 81.60Lakh

 

 

 

7

 

 

 

7

Non submission of utilization certificate

 

 

 

8

 

 

3

 

Loss ofRs.38.24 Crore to UIHEP with consequential loss ofRs.224.44 Crore to the State Exchequer resulting in to burden to the consumers of the State coupled with depletion in natural resources and environmental degradation due to less generation of Hydro Power.

 

 

 

9

 

11212013-14

 

4

Inordinate delay in procurement of two sets of Digital Automatic Voltage Regulator and Governor.

 

 

 

10

 

 

 

5

Unauthorized occupation of quarters.

 

 

 

11

 

 

 

4

Excess consumption of power over the load fixed by Management led to loss of73 .86 Lakh per annum.

 

 

 

12

 

 

 

5

Ineffective estate management resulted in loss of revenue.

 

 

 

13

 

130/2017-18

 

2

Urder recovery due to non revision of electricity charges to be recovered from the occupants of the quarters.

 

 

 

14

 

 

 

3

Blocking up of capital due to excess procurement of high value Inventory Rs 5.58 Crore.

 

 

 

15

ODISHA HYDRO POWER CORPORATION LTD. (01 IPC LTD.)- Mukhiguda Unit (UIHEP)

83/2018-19 I

 

4

Extra burden of due to higher transformation loss and auxiliary consumption Rs 177.87 Lakh

 

 

 

16

 

 

 

5

Excess transformation loss over the normal led to revenue loss ofRs.4.20 Crore.

yes

CAG

Attachment was forwarded along with the Original Reply

17

 

 

 

6

Non Implementation of Biometric attendance system at UIHEP, Mukhiguda

 

 

 

18

 

83/2018-19

2

 

Excess Transformation loss over the norm resulted in loss of revenue of Rs.6.87 crore towards cost of Energy and Electricity Duty

 

 

 

19

 

 

 

3

N on Handing over Distribution system resulted in Loss of colony consumption-

 

 

 

20

 

 

 

 

 

 

 

 

21

 

 

 

 

Rs.1.71 crore

 

 

 

Sl No

Name of PSU

IR No/Year

 

Para No

IIA

Para No

IIB

Subject

Complied

(Yes/No) 

Received from (CAG /PAC)

Attachment

22

 

20/2022-23

 

6

Non transfer of Right of Records (RoR) of Land in the name of OHP UIHEP, Mukhiguda

 

 

 

23

 

 

 

 

Idle store and stock items valuing ofRs.4.76 crore

 

 

 

24

 

 

 

 

Non disposal of Scrap/ Unserviceable materials of UIHEP, Mukhiguda

 

 

 

Sl No

Name of PSU

IR No/Year

Para No

IIA

Para No

IIB

Subject

Complied

(Yes/No) 

Received from (CAG /PAC)

Attachment

1

 

95/2010-11

 

4

Amendment of work order towards replacement of new stator at Unit-IV of Upper Kolab HEP without proportionate reduction in completion period led to abnormal  delay in replacement of work resulted in loss ofreyenue­Rs.1.25 Crore.

 

 

 

2

 

96/2011-12

 

7

Non-execution of lease agreement and non-realization of rent  from BSNL.

 

 

 

3

 

 

 

2

Wasteful expenditure on Potteru Small HEP Rs. 3.53 Crores

 

 

 

4

 

 

 

3

Delay in completion of capital Maintenance work  of unit -3 leading to loss of Rs.Rs.85.81 in Lakh towards capacity charge.

 

 

 

5

 

131/2014_15

 

4

Extra financial burden of Rs.4.64 Crores on OHPC due to non installation of separate energy Meter for colony consumption.

 

 

 

6

 

 

 

5

Non-Imposition of Liquidated Damage

 

 

 

7

 

 

 

2

Delay in Crore taking action  led to loss of capacity charges /Energy charges of Rs.3.87 crore for forced shutdown of unit-II of UKHEP,Bariniput.

 

 

 

8

 

 

 

3

Non-disposal of DP structures in time handing of over of assets without fixing commercial resulted in non-recovery Rs. of 20.19 lakh.

 

 

 

9

 

131/2017-18

 

4

Loss due less drawal of Machkund Power by OHPC

 

 

 

10

 

 

 

5

Avoidable expenditure towards watch and ward  of Rs. 1 .40 crore for non­finalisation of PSHEP operation in lease basis.

 

 

 

11

 

 

 

6

Excess  Transformation loss over the norm and loss of revenue of Rs. 75.95 lakh

 

 

 

12

 

 

 

7

Non-adjustment of advance of RS. 3.34 lakh

 

 

 

13

 

 

 

2

Accumulation of huge Non-Moving Stock amounting to Rs. 11.39 Crore.

 

 

 

14

ODISHA HYDRO POWER CORPORATION LTD. (01 IPC LTD.)- Mukhiguda Unit (UIHEP)

 

 

3

Avoidable expenditure towards R&M and watch &  Ward of Rs. 2.45 crore due to non-finalization of revival /disposal of PSHEP

yes

CAG

Attachment was forwarded along with the Original Reply

15

 

 

 

4

Non  recovery value of DP Structure (Potteru) from SOUTH CO - Rs. 1.69 Crore

 

 

 

16

 

106/2022-23

 

5

Excess Transformation Loss over the norm and loss of revenue of Rs. 1.28 crore.

 

 

 

17

 

 

 

6

Delay in completion of Capital Maintenance of, Unit - IV resulted loss of Capacity Charges - Rs. 90.45 lakh.

 

 

 

18

 

 

 

7

Delay in completion of project  under PSDF by M/s. S.R. Associates and Waival of LD - Rs. 34.37 lakh

 

 

 

19

 

 

 

8

Deficiency in Fire Safety Measures.

 

 

 

Sl No

Name of PSU

IR No/Year

Para No

IIA

Para No

IIB

Subject

Complied

(Yes/No) 

Received from (CAG /PAC)

Attachment

1

 

72/2007-08

 

8

RefundofRs.3,62,665 debited towardsinterest  on LC by Union Bank of  

India.

 

 

 

2

 

 

7

 

Non-filing of Caveat petition resulting in blockage ofRs.9.45 and loss of interest of Rs. 1 .32 crore.

 

 

 

3

 

181/2008-09

 

11

Excess reimbursement of cost of police guards to APGENCO: Rs. I 0.26 lakh,

 

 

 

4

 

 

 

19

Non production of records

 

 

 

5

 

17/2012-13

 

5

Avoidable payment of interest due to delayed payment of income tax.

 

 

 

6

 

 

 

7

Non-disposal of scrap material.

 

 

 

7

 

 

 

9

Doubtful realization of .19.50lakh from Shri Sohan Misra leaving OHPC After Foreign training.

 

 

 

8

 

 

3

 

Investment of surplus funds

 

 

 

9

 

 

 

5

Avoidable interest of Rs.2.82 crores due to delay in settlement of land compensation sold to OHPC with respect to UIHEP reservoir.

 

 

 

10

 

 

 

13

Extra expenditure ofRs.9.10 lakh.

 

 

 

11

 

 

 

14

Non recovery/ adjustment of outstanding advance ofRs.3.64 Lakh.

 

 

 

12

 

 

5

 

Discrepancies in claiming Return on Equity (ROE) by the Company in respect ofHirakud Power Station (HPS), Burla.

 

 

 

13

 

4/2014-15

7

 

Loss to the Company due to avoidable payment of dividend (Rs.16.43 crore) and excess payment of Minimum Alternate Tax (Rs.59.77 crore) with consequential loss of interest (Rs.22.72 crore) due to non-charging of interest to the Statement of Profit and Loss - Rs.98.92 crore.

 

 

 

14

 

 

 

13

Avoidable burden on the consumers of the State due to wrong calculation of depreciation in respect of Upper Indravati Hydro Electric Project (UIHEP) –RS.16.21 crore.

 

 

 

15

 

 

2

 

undue benefit of Rs. 399.91 lakh to GRIDCO towards rebate against payment of energy bills.

 

 

 

16

 

 

3

 

Increase in tariff due to excess recovery of ROE to the tune of 101.30 lakh in respect of Chipilima Hydro Electric Project.

 

 

 

17

 

 

 

4

Non possession of Land for construction of quarters leading to blockage of fund of Rs 14.34 crore.

 

 

 

18

 

 

 

5

Non-realisation of Rs.1.10 Crore due to delay in submission of claim.

 

 

 

19

 

137/2015-16

 

6

Extra expenditure of Rs.19.19 lakh due to injudicious decision on procurement of energy meters through OPTCL

 

 

 

Sl No

Name of PSU

IR No/Year

Para No

IIA

Para No

IIB

Subject

Complied

(Yes/No) 

Received from (CAG /PAC)

Attachment

20

 

 

 

7

Irregular waiver of Liquidated damage to the supplier resulting undue benefit to the sueplier for Rs. 4.34 lakh.

 

 

 

21

 

 

3

 

Loss to OHPC due to delay in handing over of distribution network at Upper Indravati Hydro Electricity Project (UIHEP) site to concerned Distribution Companies (Rs.24.16 crore) as well as excess supply of power from the power house (Rs.14.42 crore)- Rs.38.58 crore.

 

 

 

22

 

 

11

 

Excess power sold to CSPDCL than the arrangement resulting burden to consumer due to procurement of thermal power at higher cost-Rs. 2.74 Crore

 

 

 

23

 

 

 

18

Misclassification of expenditures tantamount to tariff inflation: Rs.9.36 Crore.

 

 

 

24

 

83/2016-17

 

28

Loss of capacity charges due to failure in apprising SLDC regarding generation from Unit 7 ofHHEP, Burla less than its declared capacity- Rs.0.43 crore.

 

 

 

25

 

 

 

29

Failure of the Management in apprising the-Government regarding the extant legal provision resulted in avoidable burden on OHPC with huge loan amount ofRs.766.20 crore along with interest thereon till its complete repayment along with probable burden on the consumers of the State.

 

 

 

26

 

 

 

30

Misclassification of expenditures tantamount to tariff inflation: Rs. 4.68crore

 

 

 

27

 

 

 

31

Misclassification of Expenditure amounting to Rs. J .21 crore resulted in inflated tariff.

 

 

 

28

 

 

 

35

Unauthorized occupation of quarter leading to loss of revenue

 

 

 

29

 

 

2

 

Non-realisation of Capacity Charges of Rs.3.12 crore UIHEP due non- submission of actual requirement of ca ital maintenance period to OERC

 

 

 

30

 

 

3

 

Imprudent decision to make bulk deposit led loss of interest Rs.2.21 crore.

 

 

 

31

 

 

4

 

Delay in taking action for rectification of hoist gate led to loss of Capacity charges of Rs.3 .17 crore and loss of energy charges ofRs.53.19 lakh

 

 

 

32

 

 

 

5

Non-recovery of energy charges ofRs.3.74 crore for non-reduction of MDDL of Hirakud reservoir to 595 ft

 

 

 

33

 

 

 

6

Non-realisation of energy charges ofRs.15.59 crore due to non-reduction of design energy of CHEP

 

 

 

34

 

128/2017-18

 

7

Idle investment of Rs.8.33 crore and loss of interest of Rs.4.31 crore along with loss of consultancy charges ofRs.10.86 lakh and payment of stamp duty Rs.41.36 lakh.

 

 

 

 

Sl No

Name of PSU

IR No/Year

Para No

IIA

Para No

IIB

Subject

Complied

(Yes/No) 

Received from (CAG /PAC)

Attachment

35

 

 

 

8

 Imprudent decision to invest in OSCB led to loss of Rs. 7.50 lakh towards interest.

 

 

 

36

 

 

9

Release of funds for construction of Shakti Bhawan without any agreement amount stakeholders.  

 

 

 

37

 

 

10

Taking up major repair work without consent of OSPHWC. 

 

 

 

38

 

 

12

Investment in violation of guidelines

 

 

 

39

 

 

14

Functioning of Training Centre

 

 

 

40

 

 

15

Non-adjustments of the advances to suppliers/contractors of Rs.196.34laks.

 

 

 

41

 

 

 

 

 

99/2018-19

 

 

 

2

 

Loss of revenue due to not billing power supply to CSPDCL as per CERC norm-Rs. 311.97 lakh

 

 

 

42

3

 

Failure to keep the F .D amount below Rs.1.00 crore during the validity period of L.C and resultant loss of interest - Rs.111.65 lakh

 

 

 

43

4

 

Excess recovery of Capacity Charges Rs.69.24 lakh.

 

 

 

44

 

6

Abnormal delay in truing up of Tariff of OHPC Power Stations resulting blocking_ up of revenue of Rs.187 6.46 crore.

 

 

 

45

 

8

Non Implementation of Biometric attendance system at OHPC units.

 

 

 

46

 

9

Non-adjustments of the advances to suppliers/contractors ofRs.278.08 lakhs.

 

 

 

47

 

10

Delay in implementation of PSDF scheme.

 

 

 

48

 

11

loss of Capacity Charges due to abnormal delay in repair of Intake/Surge shaft gate Qf UKHEP, Bariniput - Rs.652.92 lakh

 

 

 

49

 

12

Under recovery due to non-revision / uniform guidelines of electricity charges to be recovered from the occupants of the quarters in all Units of OHPC.

 

 

 

50

 

2

 

Delayed action for timely engagement of external agency for replacement of equipment in Unit 1 of HHEP resulted in under recovery of capacity charges of $ 10.87 crores.

 

 

 

51

 

3

 

Loss to the Government Exchequer due to less payment of Electricity Duty of 5.07 crore by OHPC deviating Odisha Electricity (Duty) Amendment Rule 2017.

 

 

 

52

152/2019-20

 

4

Imprudent Decision to make bulk deposit of Fixed deposits led to less realization of interest 4.49 crore.

 

 

 

Sl No

Name of PSU

IR No/Year

 

Para No

IIA

Para No

IIB

Subject

Complied

(Yes/No) 

Received from (CAG /PAC)

Attachment

53

 

 

 

5

Inadmissible reimbursement of Income Tax  30.24 crore to OHPC by deviation to the OERC Tariff Regulation led to unwarranted burden of the consumers of the State.

 

 

 

54

 

 

6

Avoidable payment of 46.40 lakh towards deferment of advance income tax during Financial Year 2018-19.

 

 

 

55

 

 

8

Non-realisation of Dues from GRID CO as per the agreement of Debt Securitisation.

 

 

 

56

 

 

2

Non-imposition of LD on the contractor for inordinate delay in completion of Renovation and Modernisation of Unit 5 and 6 of Hirakud Hydrb Power Project

 

 

 

57

 

 

3

In-ordinate delay in execution of Renovation and Mordernisation (R&M) work of Unit-1 to 6 of Balimela Hydro Electrical Project (BHEP) resulted in loss of Capacity Charge to the tune of Rs 19.75 crore.

 

 

 

58

 

 

4

Non-recovery of energy charges from GRIDCO and SOUTH CO - Rs. I 0.62 Crore.

 

 

 

59

 

 

5

Non procurement of Spare Parts of unit-7 & 8 of Balimela Hydro Electricity Project (BHEP) resulted in loss of generation and capacity charges- Rs. 7.55 Crore

 

 

 

60

 

 

6

Non levy of Building and Other Construction Worker's Welfare Cess on the cost of construction activities Rs.23.24 lakh.

 

 

 

61

88/2021-22

 

7

Non recovery of energy compensation charges from Industrial units-969.76 crore.

 

 

 

62

 

 

8

Excess transformation loss in the OHPC power generating stations than the norm fixed by OERC has resulted in generation loss of Rs. 4.60 Crore. (2019- 20 &2020-21)

 

 

 

63

 

 

9

Non realisation on 5.21 lakh from HDFC Bank.

 

 

 

64

 

 

10

Irregularity in fixation of pay-Reg

 

 

 

65

 

 

11

Irregularity in use of hire vehicles regarding

 

 

 

66

 

 

12

Non-Regularisation of Employees under Nominal Muster Roll and Contingent Khalasies

 

 

 

67

 

 

13

Non-transfer of Right of Records (RoR) of Land and Buildings in the name of OHPC

 

 

 

68

 

 

14

Non recovery of cost of Stolen Materials from the departmental Store UIHEP, Khatiguda.

 

 

 

 

 

 

Sl No

Name of PSU

IR No/Year

Para No

IIA

Para No

IIB

Subject

Complied

(Yes/No) 

Received from (CAG /PAC)

Attachment

69

 

 

2

 

Short drawl of power from Machkund power projet leads to over payment of -3.18 Cr.

 

 

 

70

 

3

 

Additional burden of 2.67 crore to Consumers due to irregular payment of Arrear HRA to the Executives of OHPCL.

 

 

 

71

 

 

4

Excess Payment of Rs.8.55Cr.Towards taxes and Duties on RM&U work of #5&6 in HHEP resulted loss of interest.

 

 

 

72

99/2022-23

 

5

Excess transformation loss in the OHPC power generation stations than the  norm fixed by OERC has resulted in generation loss of 2.38 crore.

 

 

 

73

 

 

6

Improper filing of ARR resulting in non recovery  of income Tax from GRIDCO-Rs.2.00 Cr.

 

 

 

74

 

 

7

Non recovery of Energy changes from  CSPDCL-Rs.1.56 Crore.

 

 

 

75

 

 

8

Infructuous expenditure to ward implementation of ERP-0.44Crore.

 

 

 

76

 

 

9

Irregularity in fixation of pay Regarding.

 

 

 

77

 

 

10

Improper implementation of manpower Restructuring in OHPC.

 

 

 

78

 

2

 

Excess payment towards the Operation and maintenance (O&M) expenditure in connection with power drawal from MHEP Project -4.82 crore

 

 

 

79

 

3

 

Non recovery of interest from GRID CO on account of MHEP share of power purchase -2.55 crore.

 

 

 

80

 

 

4

Blockage of fund. amounting to 11.47 crore  Resulted in loss of interest to the tune of 3.50 crore.

 

 

 

81

66/2023-24

 

5

Delay in repair of generator Transformer of RHEP leads to  Generation loss 7.03 crore.

 

 

 

82

 

 

6

Excess transformation loss in the OHPC Power generating stations as fixed by OERC has resulted in generation loss -4.39 crore.

 

 

 

83

 

 

7

Undue payment to the retired Directors-34.98 lakh.

 

 

 

84

 

 

8

Excess expenditure toward Corporate Social Responsibility amounting to 3.56 crore.

 

 

 

85

 

 

9

Non-Scrapping  of departmental condemned vehicles which have rendered more than 15 year of Service.

 

 

 

86

 

 

10

Observation on Legal cases.

 

 

 

Procurement

Hardware, Software, AMC, Manpower, Outsource or any other Type of Procurement

Sl No

Work OrderNo.

Work Order Date

Procurement Name

1

5451

11.06.2024

Repair & Maintenance works of Qrt. No.D/4, 3R/17 & 3R/19 at Grideo colony, BBSR

2

5647

19.06.2024

Supply of Uniform for the lady Employees of OHPC for the year 2022-23 & 2023-24

3

5679

20.06.2024

Transportation & Shifting of office articles,VC equipments , Desktops, Furniture, Files etc.

With care & caution from 1St  Floor of OHPC Corporate office at OHP&WC Building and its Bhoinagar,Bhubaneswar.

4

5748

24.06.2024

Printing and Supply of OHPC's in house journal "Varun" January-2024 edition.

5

5734

24.06.2024

Procurement of Turukis towels (75c.m.x150c.m) and Hand towels (60 c.m.x 40 c.m)

6

5855

26.26.2024

Procurement, Alignment & Balancing of 4 nos.  of tyre Bridgestone make (195/65R16) for OD-33Y5665 Maruti Ciaz Alpha Petrol-Regarding.

7

6822

25.07.2024

ISO9001:2015,ISO 14001:2015&ISO 45001:2018 Certification of latest version of CHEP,Chiplima, BHEP, Balimela,RHEP,Rengali and UKHEP,Bariput and ISO UIHEP,Mukhiguda &OHPC Coporate Office.

8

6838

26.07.2024

Printing & Supply of 150 nos. of Copies of 28th Annual Report of OHPC Ltd for the FY(2022-23)

9

6844

26.07.2024

Emerency Civil & PH repair works of OHPC  Corporate Office building at OPTCL Finance wing building ,Unit –IX,BBSR

10

6870

29.07.2024

Peripheral drain cleaning &repair and roof treatment of new corporation Office building of OHPC at Bhoinagar ,BBSR

11

7764

31.08.2024

Comprehensive Annual Maintenance Contract of one no.(10 passenger)  Elevator installed at OHPC corporate Office (Erstwhile finance building OPTCL,BBSR)for three years.

12

7996

11.09.2024

Supply of 03(Three) nos. of water purifier cum coolers to OHPC corporate Office at Bhoi-Nagar,Janpath,BBSR-751022

13

8295

23.09.2024

Renovation & Interior Furnishing works of conference Hall & its Toilet of OHPC Corporate Office building 1st  floor, Bhoinagar,Janpath,BBSR-751022,

14

8400

25.09.2024

Photography & Video shooting of OHPC project (06 Nos.) at different location of Odisha for displaying & other purposes.

15

7147

07.08.2024

Procurement of Office Stationeries & misc. items

16

8475

27.09.2024

Supply, Fitting & Fixing of water supply Connection and necessary Drainage Arrangement  for 3 Nos. of water purifiers at OHPC Corporate Office,Janpath, Boi Nagar, BBSR

17

8582

01.10.2024

Supply of Office Stationeries for one year for OHPC Corporate Office.

18

9200

21.10.2024

Preparartion of Pre-feasibility Report of PSP at Kamalkheta (250MW) and Lakaisuni (1000 MW) in Ganjam District ofOdisha".

19

9210

22.10.2024

 

Preparations of Pre-feasibility Report of PSP at Madhapur(lO00MW) in Baudha Dist. and

Panabari (250 MW) in Nayagarh District of Odisha".

20

9289

25.10.2024

Anti-termite treatment works of 1st Floor, 2nd floor & 5 rooms of Ground Floor of Corporate  Office building of OHPC at Boinagar,BBSR

21

9703

08.11.2024

Printing & Supply of Printed Materials for OHPC Corporate Office.

22

10241

27.11.2024

Designing of OHPC Diary-2025, OHPC wall Calender-2025

23

10206

26.11.2024

Printing and Supply of OHPC Diary-2025

24

10589

07.12.2024

Printing and Supply of 4500 Nos. of OHPC Wall Calender-2025

RTI Application
Years Total Number on Application Recived Total Number on Application Disposed Total Number on Application Transferred Total Number on Application Rejected
2022-23 112 89 7 16
2023-24 88 53 14 21
RTI 1st Appeals
Years Total Number on Appeal Recived Total Number on Appeal Disposed Total Number on Appeal Rejected  
2022-23 3 3 0  
2023-24 2 2 0 -
Content for this page yet to be publishedContent for this page yet to be published