17. OPERATION THEATRE UNITS:

(Number-13 and Tables-19)
Casualty OT, Cardiology OT, CTVS OT, Dental OT, ENT OT, Main OT, New Main OT, Neurosurgery OT, Obst. & Gynecology OT, Ophthalmology OT, Orthopedic OT,Plastic Surgery OT, Urology OT
Arrangement: Distributed amongst Units Heads
Equipments: Bowels apparatus, Monitoring Devices (including Anesthesia equipment), Diathermy Ventilatory equipments, ABG system, Surgical Instruments.

18.
INTENSIVE CARE UNITS:

No. of Beds Specialized equipments in each
ICU - 20 Ventilators, Pulse Oxymeter, ECG
ICCU- 8 Capnometer, Syringe pump
Surgical intensive Recovery Room of CTVS & Neurosurgery Care area
Pediatrics Intensive NICU-2: Ventilator,
Pulse Oxymeter care area
Labour Room
Clean with number of beds-12
Septic with number of beds -8

19.
CENTRAL STERLISATION SERVICES:

(a) Exclusive or with substerilisation centers also: Exclusive
(b) Equipment scope and in-service arrangement:
(i) 42lb H.P. Sterilizer -1
(ii) 300 S Vapour AX Boiler -1
(iii) 21 SR H.P. HVTS Sterilizer -1
(iv) Ekectruc G, O, Sterilizer -1
(c) Volume of work/ day - 40 to 60 drums/ day
(d) Arrangement of sterilization of mattresses and blankets

20.
CENTRAL LAUNDRY:

(a) Equipment: Mechanized - Bulk washing machine, Washing Machine Hydro extractor, Flat Hydro extractors and Rowley Steam Press, Steam press drying chamber and Manual.
(b) Volume of work -1600 clothes per day.

21.
NUMBER OF PATIENTS (O.P.D. AND INDOOR):

Outdoor
-Average Daily Patient Attendance:
Old patients-190 + New patients-1543=1733
Indoor - Annual Admissions - 96, 325 Approximate. However the data of out patient and   inpatient for current 3 years is as per below.

Sl. No.

Year

Out patient

In patient

1

2006-07

5,73,049

87,670

2

2007-08

6,06,677

88,870

3

2008-09

6,18,735

91,311


22. HOSPITAL BEDS:

Sl. No.

Department

Beds

1

Medicine: (Gen.Bed-146, ICU-04)

150

2

Cardiology: (Gen.Bed-36, ICU-08) 

44

3

Endocrinology

07

4

Gastroenterology

18

5

Haematology

05

6

Nephrology

04

[ : Information available in this manual was last accses on ]

While all efforts have been made to make this website as authentic as possible, I & PR deptt. and Luminous Infoways will not be responsible for authentication of proactive disclosure and annual report. Respective department and Public Authority is responsible for their information. Users are advised to verify/check any information with the relevant department(s) and/or other source(s), before acting on the information provided in the Portal.

Print this Manual  |  All Manuals