Sl. No

Component

Unit

2007-08 (Provisional)

2008-09

Physical

Financial

Programme

Prog

Achv.

Prog.

Achv.

Physical

Financial

12

Assistance to trainee farmers for demonstration and training

 

750

 

7.50

 

 

 

13

Technology demonstration pit methods

No

 

 

 

 

600

30.00

14

Subsidy on seed cane Commercial cane cultivation

 

 

 

 

 

4000

10.00

15

Contingencies

Rs.

 

 

3.50

3.00

 

9.91

 

TOTAL

 

 

 

47.84

23.42

 

107.30

Balanced & Integrated Use Of Fertilizer (Work Plan)

1

Provision for Micro-nutrient Testing Facility

No

1

1

19.00

19.00

 

 

2

Supply of Soil Testing Kits

No

 

 

 

 

 

 

3

Establishment of Fertilizer Testing Laboratory

No

2

2

20.00

20.00

1

50.00

4

Strengthening & Modernization of Fertilizer Testing Lab.

No

 

 

 

 

1

20.00

5

Establishment of Insecticide Testing Laboratory

No

1

1

20.00

20.00

 

 

6

Establishment of Bio-fertilizer Testing Laboratory

No

1

 

5.00

 

 

 

7

Strengthening of existing Soil Testing Lab.

No

2

 

18.00

 

1

45.00

8

Contingencies

Rs.

 

 

2.00

2.00

 

2.00

 

TOTAL

 

 

 

84.00

61.00

 

117.00

Farm Mechanisation (Work Plan)

1

Subsidy on Power Tiller

No.

3446

1610

1033.80

483.00

1817

545.10

2

Subsidy on Paddy Reaper

No.

84

80

16.80

16.00

40

8.00

3

Subsidy on Paddy Transplanter

No.

2

15

0.60

4.50

24

7.20

4

Subsidy on Power Operated Implements

No.

50

160

5.00

16.00

51

5.10

5

Subsidy on Specialised Power Operated Implements

No.

80

162

16.00

20.40

72

14.40

6

Subsidy on Rotavator

No.

80

40

16.00

8.00

40

8.00

7

Subsidy on manual/ Bullock Driven Implement

No.

2002

1200

30.03

18.00

1800

27.00

8

Rocher Sprayer

 

 

 

 

 

100

1.50

9

Subsidy on Hydrolic Traillor

No.

100

85

20.00

17.00

100

20.00

10

Subsidy on Tractor

No.

880

450

264.00

135.00

500

150.00

11

Trg. to Rural youth on farm machinery & Equip. for self Edn.

No.

 

 

 

 

 

 

12

Combine harvesters

No.

 

3

 

11.70

2

8.00

13

Contingencies

Rs

 

 

 

 

 

 

14

Exposure visit of Extension Functionaries

No.

 

 

 

 

 

 

15

Trg.-cum-Demon. On Post-harvest Management (New initiative)

Group

26

 

3.90

 

50

7.50

16

 

 

 

 

Refresher training to AAE & Mech. grade staff

Batch

 

 

 

 

 

 

 

 

 

 

Committed Liabilities

 

 

 

 

 

 

Power Tillers

 

 

 

 

322

12.78

Paddy Reapers

 

 

 

 

9

1.22

Manual/ bullock drawn Implements

 

 

 

 

9779

33.78

 

TOTAL

 

 

 

1406.13

729.60

 

849.58

[ : Information available in this manual was last accses on ]

While all efforts have been made to make this website as authentic as possible, I & PR deptt. and Luminous Infoways will not be responsible for authentication of proactive disclosure and annual report. Respective department and Public Authority is responsible for their information. Users are advised to verify/check any information with the relevant department(s) and/or other source(s), before acting on the information provided in the Portal.

Print this Manual  |  All Manuals