Brief History of the Public Authority & Context of its Formation:
Rengali Irrigation Project has been cleared by Planning Commission vide letter No.II-2(64) / 78-A & CAD Dated 31.03.1978 for execution of Samal Barrage with its left & right bank canal system, for an amount of `.233.64 Corers. The Administrative approval has been accorded for Samal Barrage with left canal System for Rs. 164 Corers vide erstwhile I & PR Department letter No.RL-32/79/ 25915 dtd.24.07.1979. Further, Planning Commission have also cleared the Rengali Irrigation Sub -Project, LBC-II (RD-30Km-141 Kms) an estimated cost of `.705.15 Corers vide No.2(64)/94-I & CAD dt. 14.7.1997.
LBC-II was cleared by CWC vide Lr. No.16/27/96-PA(N)-937-990 dt.24.06.1996. The Technical Advisory Committee, Central Wtaer Commission, Govt. of India during its 105th meeting held on 25.06.2010 have accepted the Rengali Irrigation Sub-Project LBC-II from RD.29.177 km to 141 km(revised major) Odisha for an estimated cost of `.1,958.34 Crores at 2009-10 price level, with B.C. ratio of 1.986 and subsequently investment clearance has been accorded vide Planning Commission letter No.2(64)/2008 WR dt.14.09.2010.
EIA clearance by Odisha State Pollution Control Board (OSPCB) was accorded vide Lr.No.1774/Ind-I/NOC-117 dt.16.06.1994. Environmental clearance has been obtained vide MoEF, GoI letter No.2011/7/96-IA-I dt.04.12.1996. No objection for the Project has been obtained from Ministry of Welfare (Tribal Affairs), GoI vide letter No.2011/5/96 dt.18.06.1996.
Stage-I forest clearance obtained from GoI vide MoEF letter No.8/53/96-FC dt.21.11.1996 for 2107ha of forest land. Stage-II clearance obtained vide letter No.8-53/96-FC(pt.) dt.13th/ 14th May 2003 for 812ha. of forest land. Stage-II clearance for the balance 1,295ha. of forest land is under process.
The Post of Chief Construction Engineer was created vide earstwhile I&P Deptt. letter No.23778 Dt.17.7.1978 for supervision of works of Rengali Irrigation Project. Subsequently the post of the Chief Construction Engineer was upgraded as Chief Engineer, Rengali Irrigation Project vide erstwhile I&PR department letter No.5 1828 dt.30.1 1.1984. Further the post of Chief Engineer, Rengali Irrigation Project was re-designated as Basin Manager, Brahmani Basin, vide DOWR resolution No.25990 Dt.21.10.1995. Again the post of Basin Manager, Brahmani Basin was re-designated as Chief Engineer & Basin Manager, Brahmani Basin, vide letter No.32044 Dt.19.12.95 of DOWR & thereafter the post of Chief Engineer & Basin Manager, has been renamed as Chief Engineer & Basin Manager, Brahmani Left Basin, vide DOWR order No.10774 Dt.30.9.1998 for supervision of Works of Rengali Dam, Samal Barrage & left Bank Canal System .
Duties of the Public Authority:
Duties of the Public Authority:
List of services being Provided by the Public Authority with a brief write-up on them:
Organizational Structure Diagram at various levels namely State, directorate, Region District, Block etc. (whichever is applicable):

[ : Information available in this manual was last accses on 19/05/2017 ]
While all efforts have been made to make this website as authentic as possible, I & PR deptt. and Luminous Infoways will not be responsible for authentication of proactive disclosure and annual report. Respective department and Public Authority is responsible for their information. Users are advised to verify/check any information with the relevant department(s) and/or other source(s), before acting on the information provided in the Portal.