Soochana Adhikar
Home  »  Water Resources » About the Organization

Chief Research Officer, Lower Suktel Quality Control Division, Magurbeda, Dist-Balangir

 

  MANUAL-1 

Particulars of Organization, Functions & Duties

[Section-4 (1) (b) (i)]

 Objective / Purpose of the Public Authority:

   The objective of Lower Suktel Quality Control Division under Lower Suktel Irrigation Project which is the only major irrigation project under construction in the draught prone Balangir district in K.B.K.zone of Odisha is to control the quality work of construction and maintenance of the head works to build up a storage reservoir of live storage capacity -26,343 ham with submergence of 5324.55 ha at FRL. The head work includes one central spillway, one earth dam of 1410 m length and two numbers dykes on right & left side having length of 890 and 412 m respectively including the head regulators for canal outlets on each flank . The objective is also envisages post construction maintenance of the head works including development and maintenance of a visitors' park adjacent to dam base.              

Mission / Vision Statement of the Public Authority:

   On  completion  of  the  project  with  creation  of  contemplated  irrigation potential , the economic standard of the people specifically dependant of agriculture would be uplifted substantially and the irrigation scenario of the district which is known to be the minimum in the state could be transformed  . More over, it is also proposed to substantiate drinking water to the tune of 0.567 Cumec to the fast growing urban area of Balangir city. Though the initial target for completion of the project was 2009, it could not be materialized due to several factors including obstruction by the project affected people.

Brief History of the Public Authority and Context of its Formation

The Division has been created during October, 2005.

Duties of the Public Authority:

  To accelerate the construction process under codal procedure /rules of the state government and to complete the head works within target period so that water supply can be assured for irrigation and other purposes.

Main Activities/Functions of the Public Authority:

  Quality monitoring of construction of spillway, earth dam, dykes and head regulators etc. through contract agreement with construction agencies entrusted by way of tender processing following codal procedure. Testing of construction materials , obtaining approval for quarry and borrow area ; keeping /maintaining records of history /major activities of the project pertaining to the head works including photographs and video graphs ; ensuring quality control in the works including quality control tests and maintaining records thereof .

List of Services being Provided by the Public Authority with a brief write-up on them:

  Until now, the funding for the project, hence for this division, is met through Accelerated Irrigation Benefit Programme (AIBP) scheme of Govt. of India.

Organizational Structure


Lower Suktel Quality Cofntrol Division, Magurbeda (Head : Chief Research Officer)

Sanctioned Strength / Existing as on November 2011

 

Establishment Unit

Technical Field Unit

 

 

1

Estimator (AE)

1 No.

L.S.Q,.C Sub-

L.S.Q,.C Sub-

L.S.Q,.C Sub-

L.S.Q,.C Sub-

2

Head Clerk

1 No./Nil

Divn. I (H.Q.-

Divn. II (H.Q.-

Divn. III (H.Q.-

Divn. IV (Temp.

3

Stenographer

1 No.

Balangir)

Magurbeda)

Magurbeda)

H.Q.-Magurbeda)

4

Sr. Clerk

2 No./
2 Nos.

 

 

 

 

5

Junior Clerk

7 Nos./4 Nos.

 

 

 

 

6

Peon

7 Nos./4 Nos.

1.A.R.O. -1No/1

1.A.R.O. -1No/1

1.A.R.O. -1No/1

1.A.R.O. -1No/1

7

N.W. Cum-Sweeper

2 No./ 1 No.

 

 

 

 

8

Tech. Asst.

4 No./ 2 No.

 

 

 

 

9

Embk. Inspector

4 Nos./4 Nos.

2. J.R.O. - 2No./Nil

2. J.R.O. - 1No./Nil

2. J.R.O. - 1No./Nil

2. J.R.O. - 1No./Nil

10

Asst. Embk. Inspector

5 Nos./4 Nos.

 

 

 

 

11

Dark Room Asst.

1 No./Nil

 

 

 

 

                               

  

 

 

 




[ Information available in this manual was last updated on : 16th November, 2011 ]

While all efforts have been made to make this website as authentic as possible, I & PR deptt. and Luminous Infoways will not be responsible for authentication of proactive disclosure and annual report. Respective department and Public Authority is responsible for their information. Users are advised to verify/check any information with the relevant department(s) and/or other source(s), before acting on the information provided in the Portal.

 
Select Other Public Authority(s) under Water Resources Department:
 

Share Your Comments:

We welcome your valuable feedback on this manual of proactive disclosure to improve further. Please share your views regarding the contents of this manual to get better.
(Fields marked with * are required)


* :
*
*

Please enter the Security Code