Chief Engineer & Basin Manager, Brahmani Left Basin, Samal

 

  MANUAL-1 

Particulars of Organization, Functions & Duties

[Section-4 (1) (b) (i)] 

Objective / Purpose of the Public Authority:

Rengali Multipurpose Project

(a) Rengali Dam:

  River Brahmani, the second largest in the State, drains from 39,033 km2 of catchment before falling into Bay of Bengal.  Rengali Dam, across the River Brahmani with a surface power house below the dam, constitute the 1st stage of development of Rengali Multipurpose Project. The  construction of Dam was taken up during the year 1972 and was completed during the year 1985. Since then, it has been successfully controlling the flood in Brahmani delta covering an area of 2600 Sq km. The power house has an installed capacity of 250(5x50M.W) and the generation from the1st unit started from 1985. Other units were also commissioned in phased manner and all the Units started generation from the year 1992. The total expenditure on Dam & Power House was Rs.2,032 Million.

(B) Rengali Irrigation Project :

  The second stage of development constitutes, Construction of "Samal Barrage" across the river Brahmani, 35KM down stream of the Dam, to provide irrigation to 2,18,392 ha. of land (CCA) through Left & Right Canal System, by utilizing regulated release of water from Rengali Power House out which the ayacut of Left Canal System is 1,14,300 Ha & 1,04,092,Ha. in Right Canal System. The Barrage & Canal  systems are being executed as a separate Project, named as "Rengali Irrigation Project". The project will provide Irrigation in the district of Angul, Dhenkanal, Jajpur, Keonjhar & Cuttack.

Objective of the Project :

  1. To provide Irrigation both in Left & Right canal systems for an ayacut of  2,18,392 ha.
  2. Flood Control in the Deltaic region of river Brahmani
  3. Generation of Hydro power with an installed capacity of 250 M.W (5x50M.W.) 
  4. (B) Rengali Irrigation Project :

      The second stage of development constitutes, Construction of "Samal Barrage" across the river Brahmani, 35KM down stream of the Dam, to provide irrigation to 2,18,392 ha. of land (CCA) through Left & Right Canal System, by utilizing regulated release of water from Rengali Power House out which the ayacut of Left Canal System is 1,14,300 Ha & 1,04,092,Ha. in Right Canal System. The Barrage & Canal  systems are being executed as a separate Project, named as "Rengali Irrigation Project". The project will provide Irrigation in the district of Angul, Dhenkanal, Jajpur, Keonjhar & Cuttack.

    Objective of the Project :

    1. To provide Irrigation both in Left & Right canal systems for an ayacut of  2,1he Project (LBC II, Phase I), from RD 29.177 KM to 71.313 KM of the canal, IS FUNDED BY Japan International Cooperation Agency (JICA, formally known as OECF ).

      Left Bank Canal

      Phase

      RD (KM)

      Flow (CCA)

      Lift (CCA)

      Total(CCA) (Ha)

      Financial sources

      1. LBC- I

      -

      0 -29.177

      8483

      3674

      12157

      World Bank(WRCP)

      2. LBC - II

      1

      29.177 -71.313

      26946

      2230

      29176

      JICA (On going)

       

      2

      71.313  -141.00

      66555

      6412

      72967

      JICA (Proposed)

      Total

      -

      141.00

      101984

      12316

      1,14,300

       

      Major Vision of the Project:

      1

      food production

      2

      Poverty alleviation

      3

      Employment generation



[ Information available in this manual was last updated on : 19th March, 2013 ]

While all efforts have been made to make this website as authentic as possible, I & PR deptt. and Luminous Infoways will not be responsible for authentication of proactive disclosure and annual report. Respective department and Public Authority is responsible for their information. Users are advised to verify/check any information with the relevant department(s) and/or other source(s), before acting on the information provided in the Portal.

 
Select Other Public Authority(s) under Water Resources Department:
 

Share Your Comments:

We welcome your valuable feedback on this manual of proactive disclosure to improve further. Please share your views regarding the contents of this manual to get better.
(Fields marked with * are required)


* :
*
*

Please enter the Security Code