MANUAL-1
Particulars of Organization, Functions & Duties
[Section-4 (1) (b) (i)]
Objective / Purpose of the Public Authority: Rengali Multipurpose Project (a) Rengali Dam:
River Brahmani, the second largest in the State, drains from 39,033 km2 of catchment before falling into Bay of Bengal. Rengali Dam, across the River Brahmani with a surface power house below the dam, constitute the 1st stage of development of Rengali Multipurpose Project. The construction of Dam was taken up during the year 1972 and was completed during the year 1985. Since then, it has been successfully controlling the flood in Brahmani delta covering an area of 2600 Sq km. The power house has an installed capacity of 250(5x50M.W) and the generation from the1st unit started from 1985. Other units were also commissioned in phased manner and all the Units started generation from the year 1992. The total expenditure on Dam & Power House was Rs.2,032 Million.
(B) Rengali Irrigation Project :
The second stage of development constitutes, Construction of "Samal Barrage" across the river Brahmani, 35KM down stream of the Dam, to provide irrigation to 2,18,392 ha. of land (CCA) through Left & Right Canal System, by utilizing regulated release of water from Rengali Power House out which the ayacut of Left Canal System is 1,14,300 Ha & 1,04,092,Ha. in Right Canal System. The Barrage & Canal systems are being executed as a separate Project, named as "Rengali Irrigation Project". The project will provide Irrigation in the district of Angul, Dhenkanal, Jajpur, Keonjhar & Cuttack.
Objective of the Project :
Left Bank Canal
Phase
RD (KM)
Flow (CCA)
Lift (CCA)
Total(CCA) (Ha)
Financial sources
1. LBC- I
-
0 -29.177
8483
3674
12157
World Bank(WRCP)
2. LBC - II
1
29.177 -71.313
26946
2230
29176
JICA (On going)
2
71.313 -141.00
66555
6412
72967
JICA (Proposed)
Total
141.00
101984
12316
1,14,300
Major Vision of the Project:
food production
Poverty alleviation
3
Employment generation
While all efforts have been made to make this website as authentic as possible, I & PR deptt. and Luminous Infoways will not be responsible for authentication of proactive disclosure and annual report. Respective department and Public Authority is responsible for their information. Users are advised to verify/check any information with the relevant department(s) and/or other source(s), before acting on the information provided in the Portal.